Tag: Aare

  • District heating project in Bern utilises the River Aare as an energy source

    District heating project in Bern utilises the River Aare as an energy source

    Energie Wasser Bern wants to supply the north-east of Bern with climate-friendly heat. To this end, the Bernese energy supplier is planning to build a corresponding heat production infrastructure, ewb announced in a press release. One of the sources of heat will be the water from the River Aare.

    Specifically, ewb wants to draw water from the Aare on the western bank at Engehalde and channel it into an existing cavern. Heat is to be extracted from the water here, which will then be transported to a new Aare Wyler energy centre to be built on the eastern side of the river. Properties in neighbourhoods adjacent to the energy centre could then be heated with district heating from the energy centre’s heat pumps. Ewb is also considering setting up a second, smaller Aare Engehalde energy centre on the west side of the river. It could supply the Tiefenau area with district heating.

    The company has already submitted a licence application to the Office for Water and Waste of the Canton of Bern for the construction of a catchment structure and the extraction and return of water from the Aare, explains ewb. The company expects a decision in spring 2026. In the meantime, a precise location for the planned Aare Wyler energy centre is to be found.

  • Swiss Prime Quartier Riverside is ready for occupancy

    Swiss Prime Quartier Riverside is ready for occupancy

    In Zuchwil, the new residential and work area Riverside is now ready for occupancy. According to a press release , the first tenants will move into the Widi Huus and Sulzer Huus in October. The project of the Swiss Prime Investment Foundation is characterized by modern energy supply and traffic management as well as recreational opportunities. It was also developed by the Swiss Prime Investment Foundation in Olten as a “living space”. As a location in the country with all the amenities of an urban place. The new Riverside district combines living and working. The Aare in turn connects nature with the city. The quarter has direct access to the river.

    According to Jérôme Baumann, President of the Board of Trustees of the Swiss Prime Investment Foundation, “120 apartments have already been rented. Only a few are available. ”The apartments offer a lot of quality of life. The Solothurn architect Benedikt Graf from gsj architects and agps architecture was quoted as saying that the choice of materials was "extremely careful". The heat generation for heating and water takes place sustainably via a groundwater heat pump. Natural cooling is in operation in summer.

    All apartments are designed according to the guidelines of Procap Switzerland and are wheelchair accessible. There are individual charging stations for e-vehicles at the visitor parking spaces. The parking spaces in the underground car park can also be equipped with a charging station. All five houses of the first stage should be occupied by autumn 2022.