Tag: Eröffnungsfeier

  • Third tube of the Gubristtunnel is opened

    Third tube of the Gubristtunnel is opened

    Federal Councillor Albert Rösti opened the third tube of the Gubrist Tunnel on 3 July. “Functioning national roads relieve cities and villages of alternative traffic and enable economic growth and prosperity. The network must also be able to fulfil this task in the future,” said the Transport Minister at the opening ceremony, according to a statement from the Federal Roads Office(FEDRO). “Here we are building for the mobility of tomorrow.”

    Zurich’s Director of Economic Affairs Carmen Walker Späh stressed the importance for the economic region. “With the opening of the third Gubri tube, traffic will flow much better in the direction of Bern and Lucerne – that is good for the nerves of motorists and for our national economy,” she was quoted as saying.

    Zurich city councillor Michael Baumer pointed to the relief of traffic in Switzerland’s largest city. “It’s important that the infrastructure in and around the city can keep pace with population and economic growth, while relieving congestion in the city centre, so that efficient and sustainable mobility is possible for the whole population.”

    The president of the Weiningen municipality, Mario Okle, praised the cooperation of the administrations involved. “The exchange with the cantonal and federal authorities has noticeably improved.”

    Project planning for the third tube began in 2001. Construction of the tube started in 2016. A total of 1.55 billion Swiss francs will be invested in the construction of the new tube and the renovation of the two existing tubes. The renovation work will continue until the end of 2027. After that, the tunnel will have seven lanes.

  • Spreitenbach community centre opens on 12 August

    Spreitenbach community centre opens on 12 August

    The construction of the new community centre in Spreitenbach is on schedule, according to a media release. The new building is to be presented to the population in an opening ceremony on Saturday, 12 August, between 11 a.m. and 4 p.m., according to the latest news from the negotiations of the municipal council. The interior work is currently underway. For this purpose, the floor coverings are currently being laid, the carpentry and metal construction work as well as the painting work are being carried out and the commissioning of the building services is being prepared.

    The handover of the new community centre will take place punctually at the end of June 2023, as planned in the schedule. The administrative departments are scheduled to move in at the end of August 2023.

    The building loan of 13.65 million Swiss francs for the new building was approved at the municipal assembly on 26 November 2019. The ground-breaking ceremony took place in January 2022. fsp Architekten from Spreitenbach, who were responsible for the construction, explained at the time that the new administration building was designed for a population of 15,000. When the old municipal building was built in 1964, Spreitenbach still had around 9,000 inhabitants. Today it has over 12,000.

    The municipality of Spreitenbach has been supporting the Spreitenbach Adult Education Centre with a contribution for years, according to a separate statement. The municipal council, with the participation of the local citizens’ commission, has increased the contribution for the year 2023 to 7500 Swiss francs. Within the framework of the 2024 budget, the annual contribution is to increase to 10,000 francs.