Tag: Feldmühle-Areal

  • Rorschach: New district on a former industrial site

    Rorschach: New district on a former industrial site

    The beginnings of the field mill, once a grain mill, go back to the Middle Ages. Towards the end of the 19th century, embroidery, fabric and adhesive foils were produced in the factories on the Feldmühle site. In 2015, the adhesive tape manufacturer Scapa (Schweiz) AG gave up the Rorschach production site.

    Since then, it has been quiet on the Feldmühle site at Rorschach Stadt train station. Only the historical buildings are evidence of the once industrial boom. But in the coming years a new chapter will begin on the site.

    In 2017 the Steiner Investment Foundation bought the Feldmühle site. Together with the city of Rorschach and the project developer Steiner AG, she developed a concept for the area based on the urban development program “Seestadt Rorschach” in order to ensure both quality and economic viability. The renovation of existing buildings and the construction of new ones should bring the area back to life. From 2026 the Feldmühle site will offer the population more than 300 new rental and owner-occupied apartments as well as commercial space, squares, green spaces and quiet inner courtyards.

    The project for the Feldmühle is also the result of an architecture study competition in 2018. The winning project combines individual buildings that are valuable in terms of building history and create identity with new buildings. The original character of the former industrial plant should remain noticeable and is underlined by the equivalent urban planning address. A green outside space connects buildings and inner courtyards. The area can be crossed via alleys and stairs.

    The lively west of the area creates meeting places for the population, space for business and is located directly at the Rorschach Stadt train station. A quieter, more individual world, on the other hand, is emerging in the east of the Feldmühle area. It contains mostly apartments and is characterized by a strong relationship to the inner-city green space. In addition, there is the future open stream and the free space in the direction of the Evangelical Reformed Church. The two worlds are closely interwoven and give the quarter a varied overall appearance.

    The area is currently being used temporarily. Under this name, the former gluing factory serves as an event space for events for up to 100 people. When the weather is nice, the glue shop runs a garden restaurant. She has an open
    air area with a covered event stage and space for 300 people. In addition, the roofs of the Feldmühle area were home to a colony of bees from summer 2019 to summer 2020 – a collaboration with a local beekeeper.

  • There are plans for the Rorschacher Feldmühle site

    There are plans for the Rorschacher Feldmühle site

    The Zurich-based project developer as well as total and general contractor Steiner is planning, together with the Steiner Investment Foundation , to develop the largely fallow land of the Feldmühle site in Rorschach. A sub-zone and a design plan, which was drawn up together with the city of Rorschach, will be available to the public from Monday until April 21 at the Office for Building and Urban Development. They can also be viewed on the city's website. An identical press release from Steiner and the city provides information on this.

    On the 27,500 square meter inner-city area near the train station, 40 percent residential buildings for 760 people are planned, a total of 142 condominiums and 162 rental apartments. Commercial space is to be 20 percent or 9,000 square meters.

    An underground car park, e-parking spaces and a car sharing provider are also planned. Individual, historically valuable and identity-creating buildings are retained and placed in context with new buildings. The original character of the former industrial plant should remain noticeable. Completion of the project is planned for 2025 if everything goes smoothly.