Tag: Gebäudeplanung

  • Researchers call for a paradigm shift in building and energy planning

    Researchers call for a paradigm shift in building and energy planning

    Matthias Sulzer from the Swiss Federal Laboratories for Materials Science and Technology(Empa) and his colleague Michael Wetter from the Lawrence Berkeley National Laboratory in California are advocating a paradigm shift in the planning of building and energy systems. “Due to the complexity and required flexibility of future energy systems and the urgency of change, today’s planning processes are not suitable,” explains Sulzer, who heads Empa’s Urban Energy Systems department and is also a researcher at the Lawrence Berkeley National Laboratory, in an Empa press release. “There is little to no interaction between the disciplines in order to design buildings or energy infrastructures as a holistic system.”

    Sulzer and Wetter are in favour of transferring the so-called platform-based design developed for the automation of chip production to the planning of building and energy systems. The methodology is based on various levels of abstraction on which mutually influencing systems are holistically analysed and optimised. Generally valid models are created at each level, which specify how a system is to be defined and built. The individual models can then be individually combined in practice. Such a paradigm shift could “revolutionise our planning, construction and operating processes and promote the digitalisation and automation that are essential for achieving our ambitious decarbonisation goals,” says Sulzer.

  • BKW makes the start house on the Matterhorn energy self-sufficient

    BKW makes the start house on the Matterhorn energy self-sufficient

    This year’s Ski World Cup season starts on the weekends of 11/12 and 18/19 November with cross-border races in Zermatt and Cervinia. According to a press release, BKW has erected a mobile start house on the Theodul Glacier above Zermatt that does not require an external power supply.

    The starting house measures 15 by 8 metres and is inflatable. It weighs 600 kilograms and is designed to withstand wind speeds of up to 200 kilometres per hour. Power is supplied by 40 integrated solar cells with a total output of 11 kilowatts peak.

    The system was installed by companies from the Bern-based energy service provider’s network. These included BKW Engingeering for the project management, ingenhoven architects based in Düsseldorf for the building planning and enerpeak based in Dübendorf for the electrics and photovoltaics.

    BKW is an official premium and sustainability partner of the event organiser Swiss-Ski. “We are using the partnership with Swiss-Ski to bring sustainable solutions to snow sports,” said Michael Morgenthaler, Head of Brand Experience, Partnerships & Campaigns at BKW, in the press release. “At the same time, we can show the public our broad expertise in the areas of energy, buildings and infrastructure.”