Tag: Green Village

  • Green Village Geneva: a model of sustainable urban development

    Green Village Geneva: a model of sustainable urban development

    The Green Village is an impressive project that embodies the vision of sustainable urban development. Located in the centre of Europe, in the international city of Geneva, the Green Village combines different types of buildings such as flats, offices, a hotel and a conference centre. This multi-purpose use encourages strong interaction between residents, workers and visitors. Technological innovations and integrated spaces offer a high quality of life and encourage soft mobility thanks to easy access to public transport.

    Historical integration and modern use
    The Green Village surrounds the existing World Ecumenical Centre of the World Council of Churches, built in the 1960s by the Honegger brothers, renowned Geneva architects, and classified as a historical monument by the canton. The WCC, which has been promoting peace and justice throughout the world for over 70 years, encourages dialogue and exchange between different cultures. This heritage is reflected in the architectural concept of the Green Village, which actively supports diversity and meaningful exchange.

    Symbolic buildings and innovative concepts
    The Green Village buildings are named after cities that have hosted major climate conferences, such as Montreal, Kyoto and Stockholm. This choice of name reinforces the sense of community and underlines the ecological orientation of the project. In total, the Green Village consists of seven buildings that are articulated around the central ecumenical centre and create a well thought-out network of working and living spaces.

    Sustainability and environmental protection
    A central element of the Green Village is the implementation of the “One Planet Living” philosophy, which is based on the sustainable management of resources and the promotion of biodiversity. The project incorporates global environmental measures such as energy network management, rainwater recovery and the development of natural gardens. These measures not only contribute to the project’s environmental performance, but also create a healthy and pleasant environment for all users.

    Mobility solutions for the future
    The Green Village’s location is ideal for environmentally-friendly mobility. It is in the immediate vicinity of Geneva airport, the motorway, the railway station and public transport stops. Two urban boulevards, the “Boulevard de Chancy” and the “Boulevard des Abarois”, will structure the new neighbourhoods and facilitate access to them. They will be complemented by green lanes for soft mobility and park-and-ride facilities to encourage transfers to public transport.

    Renovation and preservation of historic buildings
    The listed Ecumenical Centre will be renovated and extended as part of the project to create state-of-the-art conference facilities and workspaces. The renovation is scheduled to take place over the period 2023-2027 and will preserve the building’s historical significance while adapting it to future requirements.

  • Implenia wins two large and complex real estate projects in western Switzerland

    Implenia wins two large and complex real estate projects in western Switzerland

    New Kyoto office building in the Green Village in Geneva

    The Swiss Life Investment Foundation has commissioned Implenia as general contractor to construct the Kyoto office building in the new Green Village district on the grounds of the World Council of Churches in Geneva. The project has a total volume of more than CHF 60 million and will be around
    take two years. Implenia's Real Estate Division has been commissioned to develop the Green Village district, and Implenia's Buildings Division has already realized the Montreal residential building. The Kyoto office building has ten floors, including the ground floor, which will be partially converted at the request of the future tenant. Sustainability plays into the development of the Green
    Village plays a central role, so the new building is aiming for SNBS certification. The project was planned with BIM and executed with Lean Construction.

    New residential and commercial building on Alleestrasse in Biel

    As the general contractor, Implenia is constructing two new replacement buildings with five full floors in the Brühlstrasse Süd area in Biel for the client Meili Unternehmungen AG. A total of 105 rental apartments and service areas on the ground floor facing the street are planned to a high architectural standard. The project resulted from a study commissioned by Meili Unternehmungen AG and won by the architects Bart & Buchhofer AG. The solid construction with a rear-ventilated wooden facade is created with geothermal probes, a heat pump and a large-scale photovoltaic system. The project has a total volume of CHF 42 million and will last around two and a half years.