Tag: Hochregallager

  • New industrial building relies on modern energy and electrical engineering

    New industrial building relies on modern energy and electrical engineering

    Schlieremer Maneth Stiefel AG, with its branch in Pratteln, has taken on the project planning and construction of the electrical systems for a new high-bay warehouse at the Feldschlösschen brewery, according to a press release. The 30-metre-high building is to be constructed in the immediate vicinity of the motorway in Rheinfelden. Feldschlösschen AG, part of the Carlsberg Group, wants to use the new building to increase internal consolidation and create new storage space, the company reports.

    In addition to the lighting, low-voltage and low-current systems, Maneth Stiefel will also install the network infrastructure, including transformer stations and main distribution systems in the medium-voltage range, emergency and safety systems, and a photovoltaic system.

    Both companies emphasise that the new building represents a milestone in the development of the Rheinfelden site. Feldschlösschen is the largest employer in the town. The construction measures were planned in close consultation with the local population and will also be implemented with monument protection in mind. Feldschlösschen will celebrate its 150th anniversary in 2026.

  • Gema starts construction of new company headquarters

    Gema starts construction of new company headquarters

    Gema Switzerland has broken ground on its new headquarters in Gossau. According to a press release , the manufacturer of industrial equipment wants to develop and assemble its equipment and systems for powder coating there from summer 2024 and ship them worldwide.

    New office space and significantly larger production areas are being built on a 20,000 square meter site in the Sommerau area. Furthermore, a modern high-bay warehouse is to be built. The assembly groups previously distributed across several locations will be merged there after completion.

    The new laboratory for test and customer applications will offer 60 percent more space than the old one and will be equipped with four modern coating lines. "This means that Gema can carry out the coating tests for its customers around the world even more efficiently and practically," says the media release.

    Gema has been part of the Graco Group since 2012 and has subsidiaries in Germany, Great Britain, Italy, France, USA, Mexico, China and Japan as well as a worldwide sales network in more than 60 countries.

    With the new building in Gossau, the company is reacting to its growth and wants to offer more attractive working conditions.