Tag: immoin

  • Technopark Winterthur opens start-up meeting point

    Technopark Winterthur opens start-up meeting point

    Technopark Winterthur has completed the renovation of its 1000 square meter ground floor. The start-up meeting point, which was redesigned for around CHF 2 million, was opened to the public on Friday. It now offers spaces for networking, coworking, working groups and events.

    All conference, seminar and meeting rooms that were previously distributed in the building were moved to the ground floor, as was the coworking space called Workeria. According to a media release , new and significantly larger event spaces have been gained. This once again significantly increases the attractiveness for potential organizers. The offer for coworkers and for informal networking has now been significantly upgraded thanks to an inspiring interior design and acoustic measures. In addition, a bistro takes care of food, drinks and catering from morning to evening.

    "We discussed the plan for the renovation in detail with many stakeholders and optimized it several times – now it is a reality," says Managing Director Thomas Schumann. "I am convinced that the Technopark will further strengthen the business location and make it even better known beyond the region."

  • SHL Medical is building a sustainable new location

    SHL Medical is building a sustainable new location

    SHL Medical invests in a new location on the Tech Cluster Zug . This will consist of a 10,500 square meter production area and a 5,000 square meter office space. The manufacturer of injection systems plans to employ around 400 people there.

    Several architectural offices have developed concepts for the new location as part of a competition. The project by the architects Penzel Valier AG has now prevailed, according to a media release . In addition to SHL Medical, the jury also included the city of Zug, Metall Zug and experts from various disciplines.

    The project by the architects Penzel Valier relies on the use of wood as the main alternative material. The energy is supplied via a building-integrated solar energy system. Sea water is used for heating and cooling. The excess heat and energy is recovered for further use. Overall, according to the information, this enables zero CO2 emissions production.

    According to the announcement, the building application is planned for the end of 2021. Because the SHL Group is aiming for continuous growth in the coming years, the expansion of the location is planned in two construction phases and in four expansion stages. The commissioning of the four expansion stages is to take place in several stages.

    "The building architecture should provide an environment that optimally supports the activities of our employees and operations," Ulrich Faessler, CEO SHL Medical, is quoted in a separate press release. "As we at SHL are striving for continuous growth and in order to consolidate our pioneering role within the industry, we will further strengthen our global presence and our activities through global production," he adds.

    SHL Medical relocated its headquarters to Zug in Switzerland in 2018. One of his goals was to further strengthen the global partnership with his pharmaceutical customers. In addition to Switzerland, SHL Medical also has locations in Taiwan, Sweden and the USA.

    The Tech Cluster Zug is being built on the headquarters of V-ZUG AG in the city of Zug. V-ZUG wants to concentrate its production in the north of the area. Industrial companies, technology-related services, start-ups as well as research and educational institutions are to be located on the remaining parts of the area.

  • Schlieren will be electric in the future

    Schlieren will be electric in the future

    The city of Schlieren has purchased its first electric garbage truck. One of the three refuse vehicles in Schlieren has reached its useful life and needs to be replaced, according to a message . Since the city has been relying on e-mobility when purchasing new vehicles for reasons of sustainability since 2020, an electric model was also selected for the new refuse vehicle. This is being built by Designwerk Products AG in Winterthur.

    At its meeting on January 13, the city council approved the expenditure of 775,000 francs. The municipal parliament approved the budget for the procurement of the refuse vehicle on December 16, 2020.

    According to the announcement, the first electric refuse vehicle in Schlieren offers several advantages in operation. On the one hand there is the CO2 reduction. But the operating costs also pay off. Because the energy costs for electricity are much cheaper compared to diesel. The maintenance and repair costs are also less expensive than with diesel, because there are fewer wearing parts with electric motors than with burn-out motors. In addition, there were no HVF charges – the heavy vehicle charge – or road traffic charges. With a service life of ten years, the electric vehicle is therefore much cheaper than a diesel-powered vehicle, according to the city council's justification.

  • GOFAST and fast food go together

    GOFAST and fast food go together

    The Swiss fast charging provider GOFAST is launching a project together with McDonald's Switzerland to expand the charging infrastructure for e-cars. According to a press release , a total of 90 new charging stations for electric vehicles are to be built at numerous locations in the fast-food chain. The fact that GOFAST was able to win a new partner in McDonald's Switzerland is a real stroke of luck for the steeply growing number of e-car drivers, says Domenic Lanz, Managing Director of the e-mobility company GOFAST, which was founded in 2016. GOFAST is an abbreviation for GOtthard FASTcharge AG based in Zurich.

    The usual charging time of 20 to 30 minutes for a range of – depending on the model and the charging capacity of the batteries – around 300 kilometers can be used while eating in the restaurant. With GOFAST HPC chargers (high-power charging), e-car drivers can recharge their vehicle with outputs of up to 150 kilowatts, the message explains. Ideally, a range of up to 150 kilometers could be achieved in ten minutes. Only Swiss electricity from renewable energies is used for charging.

    The expansion begins at the McDonald's restaurants at the Martigny motorway exit with six loading spaces. The next stops are the McDrives in Hinwil, Kölliken, La Tour-de-Trême and Lugano. Aglaë Strachwitz, Managing Director of McDonald's Switzerland, is quoted in the press release: “We at McDonald's have been committed to the environment together for years. Our logistics partner drives with biodiesel and biogas, made from our kitchen waste. We rely on the train as a means of transport, for electricity on hydropower and now increasingly on fast charging stations for our guests. "

  • Agricultural Center Salez wins architecture award

    Agricultural Center Salez wins architecture award

    Constructive Alps is awarded to projects that are convincing in terms of sustainable building and renovation in the Alps. Switzerland and Liechtenstein have now awarded this prize for the fifth time, according to a media release . A total of almost 330 projects were submitted. A jury selected ten entries, of which the first three received a total of 50,000 francs. The Salez Agricultural Center took first place.

    The Agricultural Center Salez is one of the projects that show that architecture can combine aesthetics and climate protection, as stated in the communication from the Federal Office for Spatial Development (ARE). The building of the center relies on the simplest possible construction and a long lifespan. Canton and architect Andy Senn would have set new standards in terms of climate efficiency. An assembly hall in Vorarlberg and a mountain inn in Glarus made it into second and third place. In addition to seven recognition prizes, an audience award has also been determined for the first time.

    The Agricultural Center Salez consists of a conference center, farm, state farm and orchard. It is operated by the Agricultural Center SG (LZSG) together with the practical trial plots in Flawil. This also has advice centers in Kaltbrunn and Sargans.