Tag: VBZ

  • Sensors save up to 90 percent electricity at bus stops

    Sensors save up to 90 percent electricity at bus stops

    Verkehrsbetriebe Zürich ( VBZ ) and the municipal energy supplier ewz tested the use of new LED lighting at several stops in the first half of 2020. These are built in with motion sensors with which the light can be weakened to a tenth of its strength when nobody is at the stop.

    The tests have shown that power consumption can be reduced significantly. "Viewed across all illuminated bus stops, the average energy saving for LED lights with motion sensors is around 90 percent, with the situation-specific regulation of brightness additionally reducing light emissions," Martin Suter, head of bus stops at VBZ, is quoted in a statement from his company. In addition, the service life should be able to be more than doubled by weakening the light to 25 to 30 years, according to the announcement.

    In the next five years, the previous fluorescent tubes at all bus stops are to be replaced by the new LED lighting.

  • Extended tram depot including 193 rental apartments

    Extended tram depot including 193 rental apartments

    The new building project emerged as the winner of an architecture competition in 2016. The project was penned by Morger Partner Architects from Basel. The project was particularly convincing with its high space and volume efficiency, which, in addition to cost advantages, also promises energetic and operational benefits, emphasize the project managers. The building project “Tram depot and housing estate Depot Hard” includes the partial renovation of the existing, listed tram depot from 1912, the construction of a modern depot hall with a total of 25 tram parking spaces. In addition, there are provision, maintenance and repair areas as well as operating and service rooms for the Zurich transport company.

    Living space for around 550 people
    In addition, a new urban housing estate is being built with a total of 193 apartments of various sizes. It offers living space for around 550 people. In addition to apartments in the base construction on the Limmat, maisonette apartments (townhouses) are being built. They offer direct access to the courtyard. The offer is to be supplemented with apartment blocks in the two high-rise buildings. They extend to the 22nd and 23rd floors respectively. In addition, various studio, commercial and service areas as well as a public footpath and bicycle path with lounge areas are planned along the Limmat.

    Tram depot as the base of the development
    The new tram depot forms the base of the superstructure and is built over with two-storey row buildings as a geometric connection to the residential buildings of the existing complex, explain the project managers. This creates a relationship to the existing building both in terms of the height of the building and in terms of its geometry. The area between the row buildings is to be used as a spacious and versatile courtyard for the residents of the housing estate. The two high-rise residential buildings, which will be located together with the two existing high-rise buildings on the opposite side of Hardturmstrasse, mark the entrance to the Zurich-West quarter. ■