Tag: Weitblick

  • Business opportunities in the Uri valley floor

    Business opportunities in the Uri valley floor

    Werkmatt Uri is one of the last large land reserves in the Uri valley floor. The first industrial uses with a direct railway connection were already established here during the First World War. The listed grain stores designed by architects Eduard Züblin and Robert Maillart in 1912/13 are particularly characteristic. These buildings will be preserved as landmarks and converted into an exhibition centre and art warehouse. The canton is investing in infrastructure to further develop the area between the new Altdorf cantonal railway station and the future Altdorf South motorway junction.

    Optimum location and economic impetus
    Uri is strategically located on the most important European north-south axis with the Gotthard Base Tunnel and the A2 motorway. The immediate proximity to the Altdorf intercity railway station and a modern bus concept promote the accessibility of Werkmatt. The improved accessibility provides impetus for economic and residential projects. With “Vena”, “Cubo” and “Strickermatte”, private investors have realised modern residential developments within walking distance.

    Development with vision
    Kässbohrer Schweiz AG has already recognised the added value of Werkmatt and relocated its headquarters to Altdorf in 2019. The new service building has created 30 qualified jobs in the areas of administration, sales, service, training, final assembly and production of special vehicles, mainly snow groomers. Werkmatt AG is also developing an innovative utilisation concept for building plots 9 and 13. The plans include a multifunctional centre with a business hotel with 80 rooms, co-working spaces, commercial and cultural spaces, restaurants and fitness and recreation areas.

    Targeted planning for sustainable growth
    As the owner, the canton of Uri is striving for a win-win situation with the future owners, users and investors in the area. The plots are to be sold and built on gradually over the next few years. The canton is developing the Werkmatt Uri site in a coordinated manner so that sustainable economic uses are created in the interests of the region as a whole. To this end, it is drawing up guidelines – including those relating to workplace density. The neighbourhood design plan serves as a planning instrument for investors and companies wishing to build on the site, which is binding on the owner and defines the parcel of land. It sets guidelines regarding utilisation, design and infrastructure.

    Success through co-operation
    Werkmatt Uri is an example of coordinated and sustainable site development. Companies benefit from a committed administration, short decision-making processes and needs-orientated solutions. The region expects the project to provide long-term economic impetus and create more than 1,000 jobs.
    Werkmatt Uri is therefore much more than just an industrial area, it is an economic driver and an attractive location for forward-looking companies.

  • Strabag builds roads in the Weitblick district of Solothurn

    Strabag builds roads in the Weitblick district of Solothurn

    The Schlieren-based construction company Strabag is carrying out work in the future Weitblick district of Solothurn to create a network of roads and paths as well as all utility lines. According to a press release, the new Weitblick district in Solothurn will be completed by 2036. The district will provide living space for around 1,700 people and accommodate the same number of jobs. There will be a new park and recreational space. Thanks to Weitblick, the city of Solothurn will be able to create new living space and space for new life in a central location, in the existing district structures and at the gates of the old town, the press release continues.

    According to the press release, Strabag has been involved in the project since the start of construction. In April 2023, Strabag teams began road construction work in the northern part of the site. Last September, Strabag laid the surface for the first road in Weitblick. After a construction break, the final work is now in full swing and the job will be completed in this part of Weitblick in the next few weeks. Construction work in the southern part of the Weitblick site is currently in full swing, according to Strabag.

    The subsoil in this area is also difficult to build on due to the high groundwater level. Sheet piling, bored piles and a lowering of the groundwater level were therefore necessary. All special civil engineering work was carried out by Strabag. The trenches for the utility lines are currently being excavated and the access roads for the Weitblick site are being constructed.