Tag: Wetzikon

  • The Settlers of Guldisloo

    The Settlers of Guldisloo

    The Guldisloo area is easily accessible between the two centers of Unterwetzikon and Oberwetzikon. The closeness to nature, in particular the farsightedness at this slightly elevated and central location, characterizes the location in particular. The planned residential development with 22 owner-occupied units is attached to the small-grained single-family house district along the ring road and forms the southern end of the Ringetshalden free zone.

    The basic idea of the design includes an optimal embedding of the buildings in the existing neighborhood structure and the green environment. The available building mass is distributed over four similarly sized, free-standing main buildings. As a result, the new buildings appear compact and, with short facades, can react optimally to their small-scale counterparts. The setting of the volumes takes into account the existing visual relationships of the quarter and allows maximum views towards the free zone and a distant view of the Alps. All squares and meeting zones are open to the Quartierstrasse and invite instead of being closed off. The new housing estate is given a uniform expression by plastered surfaces in a warm beige tone, which avoids a striking contrast to the built environment and instead blends gently into the existing structure.

    According to the energy plan of the city of Wetzikon, the project area belongs to the area that is developed with gas. However, the project area is also referred to as a zone with low building density, and a withdrawal of the gas network from these areas is conceivable in the future. No heating network is planned on the project area, and the heating network of the ARA Flos is not to be extended to include the project site. On the other hand, the project area is very well suited for geothermal probes. There is no gravel groundwater to be expected, the rock of the upper freshwater molasse is already expected at less than 25 m and extends to a depth of approx. 350 m Geothermal probe heat pumps can be realized.

    The view at a glance.
  • Halter redesigns the center of Wetzikon

    Halter redesigns the center of Wetzikon

    With the demolition of buildings in the northern part of the planned new development, the Schliere-based construction company Halter AG has started to redesign the center of Wetzikon . According to the media release , a lively center with shops, services and apartments is to be built there by the end of 2025. In the past two years, Halter AG, as the developer, has brought the project to construction maturity together with the Wetziker architectural office meierpartner . The investor is Turintra AG Zurich, represented by UBS Fund Management. The investment volume on the 9013 square meter area amounts to around 138 million Swiss francs. 

    The shell construction work for the building construction of the first stage is to begin in the spring. Delivery is planned for November 2023. The second stage should be ready for occupancy in November 2025. According to a statement by Halter AG, the superstructure offers space for shops and restaurants, public-oriented uses and a medical center. Rental apartments ranging in size from 2.5 to 4.5 rooms for different target groups are being built on the upper floors. Some of the rental apartments are offered according to the MOVEment concept, in which electronically movable room elements create living comfort in a small space.

    114 apartments and 35 MOVEment apartments are planned. 3,100 square meters are planned for the services area, and 4,600 square meters for sales and gastronomy. Garages for 176 cars, 34 motorcycles and 450 bicycles will be created.

    A central city lane for pedestrians and passers-by and a city square are to be created in Wetzikon. A "Spanish Step" is intended to serve as a cross connection between Bahnhofstrasse and Jörg-Schneider-Park as well as the Wetzikon vocational school.