{"id":101911,"date":"2024-06-20T08:55:57","date_gmt":"2024-06-20T06:55:57","guid":{"rendered":"https:\/\/www.immo-invest.ch\/sak-und-tisca-nehmen-photovoltaikanlage-in-betrieb\/"},"modified":"2024-06-20T09:07:16","modified_gmt":"2024-06-20T07:07:16","slug":"sak-und-tisca-nehmen-photovoltaikanlage-in-betrieb","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/sak-und-tisca-nehmen-photovoltaikanlage-in-betrieb\/","title":{"rendered":"SAK and Tisca put photovoltaic system into operation"},"content":{"rendered":"<p class=\"bodytext\">St.Gallisch-Appenzellische Kraftwerke AG<a href=\"https:\/\/www.sak.ch\/\" target=\"_blank\" rel=\"noopener\">(SAK<\/a>) from St.Gallen and the textile manufacturer <a href=\"http:\/\/www.tiscatiara.com\/\" target=\"_blank\" rel=\"noopener\">Tisca<\/a> from B&uuml;hler AR have put a large photovoltaic system into operation. According to a <a href=\"https:\/\/www.presseportal.ch\/de\/pm\/100086681\/100920525\" target=\"_blank\" rel=\"noopener\">press release<\/a>, SAK has installed solar panels covering an area of 4,250 square metres on the reconstructed roofs of the Tisca production halls at the Urn&auml;sch site. The construction and maintenance of the solar system was free of charge for Tisca, but the company is tied to the refinancing with a photovoltaic <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Contracting&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Gesamt&uuml;bernahme von Projektierung, Erstellung, Betrieb, Unterhalt und Finanzierung eines Bau- oder Anlageteils durch einen Unternehmer und dessen Zurverf&uuml;gungstellung gegen Entgelt (z.B. Energie-Contracting)&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">contracting<\/span> agreement. Tisca receives solar power from the electrical energy produced on its own property at a fixed price. Both companies are contributing to the implementation of Energy Strategy 2050.<\/p>\n<p class=\"bodytext\">&ldquo;With photovoltaic <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Contracting&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Gesamt&uuml;bernahme von Projektierung, Erstellung, Betrieb, Unterhalt und Finanzierung eines Bau- oder Anlageteils durch einen Unternehmer und dessen Zurverf&uuml;gungstellung gegen Entgelt (z.B. Energie-Contracting)&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">contracting<\/span>, a commercial or industrial building owner makes their roof available for photovoltaic expansion. SAK finances and is responsible for the planning, construction and maintenance,&rdquo; Ralph Egeter, Head of Project Development at SAK, is quoted as saying in the press release. &ldquo;Once the project is completed, the companies can use the solar power produced by the system for their own consumption at a fixed price. As compensation for the use of the roof, the companies receive a defined amount of solar energy at zero cost, depending on the size of the system. With this commitment, we are giving trade and industry a simple and cost-effective opportunity to invest in the energy future of Eastern Switzerland.&rdquo;<\/p>\n<p class=\"bodytext\">SAK has installed a total of three photovoltaic systems at Tisca. The one now in operation is currently the largest in the canton of Appenzell Ausserrhoden.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The St.Gallisch-Appenzellische Kraftwerke AG (SAK) and textile manufacturer Tisca have installed a large photovoltaic system in Urn\u00e4sch. The installation covers 4250 square meters and contributes to the Energy Strategy 2050.<\/p>\n","protected":false},"author":2,"featured_media":101908,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12482,12476,22698],"tags":[12526,22977,12751,17517],"class_list":["post-101911","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-immonews","category-sustainability","tag-immonews-en","tag-photovoltaikanlage-en","tag-solarstrom-en","tag-tisca-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The St.Gallisch-Appenzellische Kraftwerke AG (SAK) and textile manufacturer Tisca have installed a large photovoltaic system in Urn\u00e4sch. The installation covers 4250 square meters and contributes to the Energy Strategy 2050.","autor":"","ort":"","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2024\/06\/Unbenannt-23-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/101911","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=101911"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/101911\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/101908"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=101911"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=101911"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=101911"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}