{"id":117508,"date":"2024-10-18T10:19:58","date_gmt":"2024-10-18T08:19:58","guid":{"rendered":"https:\/\/www.immo-invest.ch\/erste-niederdruckturbine-der-schweiz-in-martigny-bourg-in-betrieb-genommen\/"},"modified":"2024-10-18T11:17:10","modified_gmt":"2024-10-18T09:17:10","slug":"erste-niederdruckturbine-der-schweiz-in-martigny-bourg-in-betrieb-genommen","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/erste-niederdruckturbine-der-schweiz-in-martigny-bourg-in-betrieb-genommen\/","title":{"rendered":"Switzerland&#8217;s first low-pressure turbine commissioned in Martigny-Bourg"},"content":{"rendered":"<p class=\"bodytext\">The Forces Motrices de Martigny-Bourg (FMMB) have commissioned Switzerland&rsquo;s first low-pressure turbine. As <a href=\"https:\/\/www.alpiq.ch\" target=\"_blank\" rel=\"noopener\">Alpiq<\/a> writes in a <a href=\"https:\/\/www.alpiq.ch\/alpiq-gruppe\/medien\/medienmitteilungen\/media-release-detail\/commissioning-of-a-new-low-head-turbine\" target=\"_blank\" rel=\"noopener\">press release<\/a>, 850,000 kilowatt hours of electricity can now be generated per year in the underwater channel of the river power plant on the Dranse. The power plant&rsquo;s current three production units generate 89 million kilowatt hours per year.<\/p>\n<p class=\"bodytext\">Depending on the flow rate, the low-pressure turbine can turbine between 1.25 and 10.2 cubic metres of water per second. It is designed for a head of up to 2.5 metres. It has no additional impact on the environment and does not affect existing electricity production. &ldquo;The installation of this new low-pressure turbine makes it possible to make the best possible use of the available water resources while at the same time being considerate of the environment,&rdquo; said power plant manager Georges-Alain Zuber in the press release.<\/p>\n<p class=\"bodytext\">Planning for the plant began in 2011. It is being subsidised with funds from the cost-covering feed-in remuneration.<\/p>\n<p class=\"bodytext\">The power plant was built in 1908 as an electricity generator for Electro-Chimie de Paris. Today, the municipalities of Bovernier with 23.04 per cent, Sembrancher with 18.72 per cent, Martigny with 17.22 per cent, Martigny-Combe with 15.58 per cent and Voll&egrave;ges with 1.64 per cent as well as Alpiq with 18 per cent and the Valais energy supplier <a href=\"https:\/\/fmv.ch\/de\/startseite\/\" target=\"_blank\" rel=\"noopener\">FMV<\/a> with 5.8 per cent have a stake in FMMB.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Forces Motrices de Martigny-Bourg (FMMB) has commissioned the first Swiss low-pressure turbine. It can generate 850,000 kilowatt hours of electricity in the existing run-of-river power plant in addition to the three existing production units.<\/p>\n","protected":false},"author":2,"featured_media":117494,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12482,12476,22698,47887],"tags":[20529,14087,40232,12564,12525,12526,14779,15021,12528,50037,12586,37962,43236,14305,12549],"class_list":["post-117508","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-immonews","category-sustainability","category-wallis-en","tag-alpiq-en","tag-energieversorgung-en","tag-erneuerbare-energien-en","tag-immobilien-en","tag-immoinvest-en","tag-immonews-en","tag-kraftwerk-en","tag-martigny-en","tag-news-en","tag-niederdruckturbine-en","tag-schweiz-en","tag-stromproduktion-en","tag-umweltfreundlichkeit-en","tag-wasserkraft-en","tag-wasserressourcen-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Forces Motrices de Martigny-Bourg (FMMB) has commissioned the first Swiss low-pressure turbine. It can generate 850,000 kilowatt hours of electricity in the existing run-of-river power plant in addition to the three existing production units.","autor":"ce\/stk, Bild: alpiq \/ Forces Motrices de Martigny-Bourg","ort":"Martigny VS","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2024\/10\/2024-10-18-09_55_55-csm_FMMB_turbine_1140x711_1c4b204adf.webp-768\u00d7479-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/117508","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=117508"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/117508\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/117494"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=117508"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=117508"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=117508"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}