{"id":119115,"date":"2024-11-11T10:35:32","date_gmt":"2024-11-11T09:35:32","guid":{"rendered":"https:\/\/www.immo-invest.ch\/neues-bezirksgebaeude-in-lenzburg-erhaelt-markantes-betonkunstwerk\/"},"modified":"2024-11-11T10:59:10","modified_gmt":"2024-11-11T09:59:10","slug":"neues-bezirksgebaeude-in-lenzburg-erhaelt-markantes-betonkunstwerk","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/neues-bezirksgebaeude-in-lenzburg-erhaelt-markantes-betonkunstwerk\/","title":{"rendered":"New district building in Lenzburg receives striking concrete artwork"},"content":{"rendered":"<p class=\"bodytext\">The artwork &ldquo;Gedankenspeicher&rdquo; by <a href=\"http:\/\/paultakacs.com\/\" target=\"_blank\" rel=\"noopener\">Paul Tak&aacute;cs<\/a> in front of the new district building in <a href=\"https:\/\/www.lenzburg.ch\/\" target=\"_blank\" rel=\"noopener\">Lenzburg<\/a> has been realised by the construction company <a href=\"https:\/\/haechlergruppe.ch\/\" target=\"_blank\" rel=\"noopener\">H&auml;chler<\/a>. According to a <a href=\"https:\/\/haechlergruppe.ch\/stein-fuer-stein-der-bau-des-gedankenspeichers-in-lenzburg\/\" target=\"_blank\" rel=\"noopener\">press release<\/a>, the approximately seven-metre-high concrete stele was clad step by step with stones in different colours, shapes and sizes. A total of 35 tonnes of stones were used for the construction. Each of the stones, weighing between 30 and 150 kilograms, was carefully selected and placed on the stele by hand, according to the H&auml;chler press release.<\/p>\n<p class=\"bodytext\">The Wettingen-based construction company H&auml;chler Group seconded its employees Reto Schwitter and Dear Sadiku for the work, who worked closely with the artist Paul Tak&aacute;cs. Construction work began at the beginning of September with the foundations. The concrete stele was then erected as the scaffolding for the &ldquo;Thought Memory&rdquo;.<\/p>\n<p class=\"bodytext\">Before the stones were installed, Paul Tak&aacute;cs and the H&auml;chler employees spent two days in a gravel pit to select the individual stones. Despite being delivered by crane, each stone was moved by hand several times before being installed in its final position. The aim was to create a work of art that was both aesthetically and structurally impressive. The &ldquo;Gedankenspeicher&rdquo; was completed at the end of September.<\/p>\n<p class=\"bodytext\">Paul Tak&aacute;cs was born in the USA and lives and works in Nussbaumen TG. His work includes oil painting, wall drawing, sculpture, adhesive works and video.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The construction company H\u00e4chler has built the &#8220;Gedankenspeicher&#8221; designed by Paul Tak\u00e1cs in front of the new district building in Lenzburg. The seven-metre-high object made of 35 tonnes of stone was erected in one month.<\/p>\n","protected":false},"author":2,"featured_media":21756,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12491,22358,12476,12485],"tags":[50410,12525,12526,12528,46921,50411],"class_list":["post-119115","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aargau-en","category-construction","category-immonews","category-projects-en","tag-betonkunstwerk-en","tag-immoinvest-en","tag-immonews-en","tag-news-en","tag-oeffentlicher-raum-en","tag-stele-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The construction company H\u00e4chler has built the \"Gedankenspeicher\" designed by Paul Tak\u00e1cs in front of the new district building in Lenzburg. The seven-metre-high object made of 35 tonnes of stone was erected in one month.","autor":"ce\/gba\u00a0","ort":"Wettingen\/Lenzburg AG","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11-150x150.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/119115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=119115"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/119115\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/21756"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=119115"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=119115"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=119115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}