{"id":121881,"date":"2024-12-17T09:00:00","date_gmt":"2024-12-17T08:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=121881"},"modified":"2024-12-17T08:45:40","modified_gmt":"2024-12-17T07:45:40","slug":"neue-solaranlage-auf-ehemaliger-deponie-genehmigt","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/neue-solaranlage-auf-ehemaliger-deponie-genehmigt\/","title":{"rendered":"New solar plant approved on former landfill site"},"content":{"rendered":"<p class=\"bodytext wp-block-paragraph\">The Basel-based energy supplier <a href=\"https:\/\/www.iwb.ch\/\" target=\"_blank\" rel=\"noopener\">IWB<\/a> has received planning permission for the construction of a solar plant on the former Hinterm Chestel landfill site in Liesberg. The investment decision is expected to be made at the beginning of 2025, according to a <a href=\"https:\/\/iwb.hosting.augure.com\/Augure_IWB\/default.ashx?WCI=EmailViewer&amp;id=%7Bd7a77667-436d-4af2-9f3c-a0beecbfbdf5%7D\" target=\"_blank\" rel=\"noopener\">press release<\/a>. Following a swift start to construction, the first solar power, which can supply around 1,000 households, is expected to flow as early as spring 2026.<\/p>\n\n\n\n\n\n<p class=\"bodytext wp-block-paragraph\">7,600 solar modules are to be installed on an area of 25,000 square metres. This corresponds to an installed capacity of 3.4 megawatts. The system will be installed at a certain height so that green areas can continue to be cultivated below. This should also benefit local biodiversity.<\/p>\n\n\n\n\n\n<p class=\"bodytext wp-block-paragraph\">&ldquo;It is important to us that the plant is realised in an environmentally friendly way. For this reason, we deliberately integrated existing natural objects during the planning phase in coordination with <a href=\"https:\/\/www.kelsag.ch\/\" target=\"_blank\" rel=\"noopener\">KELSAG<\/a>,&rdquo; Daniel Neuenschwander, Project Manager for large-scale photovoltaic systems at IWB, is quoted as saying in the press release. KELSAG (Kehrichtbeseitigung Laufental-Schwarzbubenland AG) is the owner of the landfill site and will make the area available for up to 50 years.<\/p>\n\n\n\n\n\n<p class=\"bodytext wp-block-paragraph\">The habitat of various animal species is also taken care of. &ldquo;We closely involved nature and environmental organisations in this project right from the start. That was the recipe for success for a balanced project: the concerns of electricity production and biodiversity are given equal consideration,&rdquo; says Neuenschwander.<\/p>\n\n","protected":false},"excerpt":{"rendered":"<p>The Basel-based energy supplier IWB has received authorisation to build a solar plant on the former landfill site in Liesberg. From spring 2026, solar power for around 1000 households will be generated from here.<\/p>\n","protected":false},"author":2,"featured_media":121875,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12494,12482,12476,12485,22698],"tags":[51164,13822,51165,12525,12526,51166,12528,12529,12751,37962],"class_list":["post-121881","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-region-basel-en","category-energy","category-immonews","category-projects-en","category-sustainability","tag-biodiversitaet-2-en","tag-erneuerbare-energie-en","tag-gruendach-en","tag-immoinvest-en","tag-immonews-en","tag-liesberg-en","tag-news-en","tag-photovoltaik-en","tag-solarstrom-en","tag-stromproduktion-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Basel-based energy supplier IWB has received authorisation to build a solar plant on the former landfill site in Liesberg. From spring 2026, solar power for around 1000 households will be generated from here.","autor":"ce\/ww","ort":"Basel\/Liesberg BL","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2024\/12\/immo_invest_basel_projekt_energie_solarstrom_liesberg-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/121881","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=121881"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/121881\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/121875"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=121881"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=121881"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=121881"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}