{"id":130029,"date":"2025-04-08T10:00:00","date_gmt":"2025-04-08T08:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=130029"},"modified":"2025-04-08T09:07:39","modified_gmt":"2025-04-08T07:07:39","slug":"meilenstein-fuer-den-modernen-lehmbau","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/meilenstein-fuer-den-modernen-lehmbau\/","title":{"rendered":"Milestone for modern clay construction"},"content":{"rendered":"<p class=\"wp-block-paragraph\">This is based on the new DIN 18940 standard, which regulates load-bearing clay block masonry comprehensively for the first time. The thin-bed method saves over a third of the working time compared to the thick-bed method and reduces material consumption. In addition to the processing, clay also scores points ecologically. It is not burnt, is fully recyclable and ensures a healthy indoor climate thanks to its moisture-regulating properties.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>CO&#8322;-neutral production and circular building system<br><\/strong>The production of clay bricks at GIMA is CO&#8322;-neutral. Dried with solar power and waste heat. The wall structure can be completely dismantled. A double-skin construction is recommended for exterior walls: Clay bricks as the load-bearing layer, clay plaster on the inside and a curtain wall on the outside. All materials can be separated by type and recycled.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Formats and possible applications<br><\/strong>The GIMA bricks achieve compressive strength class 5 and are available in widths from 115 to 365 mm, adapted to common brick formats. They can be processed using conventional tools and known methods.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Pilot project &ldquo;GreenConceptLehm<\/strong>&ldquo;<strong><br><\/strong>The first project with the new system has already been realized in Mei&szlig;en. Building contractors and scientists praise the healthy indoor climate and recyclability. This shows that earth building is ready for widespread use in the modern construction industry.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>For the first time, the German Institute for Building Technology has issued a general type approval for load-bearing clay block masonry using the thin-bed method. The GIMA vertically perforated clay brick may therefore be used for load-bearing walls up to building class 4. In combination with the energy-efficient clay thin-bed mortar from ClayTec, processing is significantly more economical than before.<\/p>\n","protected":false},"author":2,"featured_media":129985,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22358,22351,12476,12487,22698,22433],"tags":[52493,12525,12526,52494,12528,14959],"class_list":["post-130029","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-global-en","category-immonews","category-regions-en","category-sustainability","category-trends-en","tag-duennbettverfahren-en","tag-immoinvest-en","tag-immonews-en","tag-lehmziegel-en","tag-news-en","tag-zirkulaeres-bauen-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"For the first time, the German Institute for Building Technology has issued a general type approval for load-bearing clay block masonry using the thin-bed method. The GIMA vertically perforated clay brick may therefore be used for load-bearing walls up to building class 4. In combination with the energy-efficient clay thin-bed mortar from ClayTec, processing is significantly more economical than before.","autor":"Quelle ingenieur","ort":"","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"480","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2025\/04\/4_GIMA_Lehmziegel_Bauhaus-Filmwerkstatt-scaled-e1743499008644-1200x600-1-336x168.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/130029","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=130029"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/130029\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/129985"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=130029"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=130029"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=130029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}