{"id":135336,"date":"2025-07-07T08:35:00","date_gmt":"2025-07-07T06:35:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=135336"},"modified":"2025-07-04T16:02:21","modified_gmt":"2025-07-04T14:02:21","slug":"barrierefreie-modernisierung-des-bildungszentrums-im-limmattal-gestartet","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/barrierefreie-modernisierung-des-bildungszentrums-im-limmattal-gestartet\/","title":{"rendered":"Barrier-free modernisation of the education centre in Limmattal begins"},"content":{"rendered":"<p class=\"bodytext\">In a <a href=\"https:\/\/www.zh.ch\/de\/news-uebersicht\/medienmitteilungen\/2025\/07\/bildungszentrum-limmattal-in-dietikon-wird-umfassend-erneuert.html?utm_campaign=newsaboktzh&amp;utm_medium=Bildung&amp;utm_source=immediately&amp;utm_content=Bildungszentrum-Limmattal-in-Dietikon-wird-umfassend-erneuert\" target=\"_blank\" rel=\"noopener\">press release<\/a>, the <a href=\"https:\/\/www.zh.ch\/de.html\" target=\"_blank\" rel=\"noopener\">Canton of Zurich<\/a> has announced the start of construction work on the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> of the Limmattal Education Centre<a href=\"https:\/\/bzlt.ch\/\" target=\"_blank\" rel=\"noopener\">(BZLT<\/a>) in Dietikon. The listed building is to be renovated over two years from the start of the summer holidays and will offer a modern learning environment that is adapted to the needs of the students.<\/p>\n<p class=\"bodytext\">Built in 1969, the vocational school building is largely in its original condition and is used by the BZLT as a competence centre for logistics, road transport and recycling professions. With an investment of CHF 42 million, the building is now being renovated to provide an improved and barrier-free learning environment once the work is completed in 2027. Zurich-based <a href=\"https:\/\/www.enf.ch\/\" target=\"_blank\" rel=\"noopener\">Ernst Niklaus Fausch Partner AG<\/a> is responsible for the architectural design.<\/p>\n<p class=\"bodytext\">An open, interdisciplinary learning landscape is to be created on the top floor, offering various opportunities for self-directed and collaborative learning. Meanwhile, the basement areas are to be converted into modern sports rooms.<\/p>\n<p class=\"bodytext\">With the conversion, the education centre will be certified according to <a href=\"https:\/\/www.minergie.ch\/de\/standards\/neubau\/eco\/\" target=\"_blank\" rel=\"noopener\"><span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Minergie-Eco&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Erg&auml;nzender Baustandard zum Minergie oder Minergie-P-Standard. Dabei werden Anforderungen einer gesunden und &ouml;kologischen Bauweise ber&uuml;cksichtigt&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Minergie-ECO<\/span><\/a> standards and the Swiss Sustainable Building Standard<a href=\"https:\/\/www.snbs-hochbau.ch\/\" target=\"_blank\" rel=\"noopener\">(<span class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;SNBS&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Standard nachhaltiges Bauen Schweiz; Ziel des Standards ist es, die drei Dimensionen des nachhaltigen Bauens (Gesellschaft, Wirtschaft, Umwelt) m&ouml;glichst umfassend in Planung, Bau und Betrieb mit einzubeziehen&lt;\/div&gt;\"  data-mobile-support=\"0\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex='0' role='link'>SNBS<\/span><\/a>). The building will be connected to the regional district heating network and a technology centre with a photovoltaic system will be built on the roof. Green roof and terrace areas will also contribute to cooling and promote biodiversity. After the refurbishment, the building will also be barrier-free.<\/p>\n<p class=\"bodytext\">The building designed by architect Georges K&uuml;nzler is a listed building. The modernisation and <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> measures were therefore developed in collaboration with the cantonal monument preservation authorities. Among other things, the external appearance of the fa&ccedil;ade is to be preserved. The work is due to be completed in 2027. Until then, the school will temporarily operate in the school building at Lagerstrasse 55 in Zurich.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Canton of Zurich will comprehensively renovate the Limmattal Education Centre (BZLT) from the start of the summer holidays. The aim is to create a modern, sustainable and barrier-free infrastructure that offers students an inspiring learning environment.<\/p>\n","protected":false},"author":2,"featured_media":21560,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22358,12476,12490,39679],"tags":[53580,12525,12526,53581,12528,53582],"class_list":["post-135336","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-immonews","category-refurbishment","category-standorte-en","tag-bildungsbau-en","tag-immoinvest-en","tag-immonews-en","tag-minergie-eco-en","tag-news-en","tag-umbau-berufsschule-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Canton of Zurich will comprehensively renovate the Limmattal Education Centre (BZLT) from the start of the summer holidays. The aim is to create a modern, sustainable and barrier-free infrastructure that offers students an inspiring learning environment.","autor":"ce\/nta","ort":"Dietikon ZH\/Z\u00fcrich ","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2021\/05\/bauen-5-e1622127424740-150x150.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/135336","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=135336"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/135336\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/21560"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=135336"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=135336"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=135336"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}