{"id":136707,"date":"2025-08-07T16:42:00","date_gmt":"2025-08-07T14:42:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=136707"},"modified":"2025-08-06T15:44:44","modified_gmt":"2025-08-06T13:44:44","slug":"alpines-solarprojekt-ueber-2000-meter-gestartet","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/alpines-solarprojekt-ueber-2000-meter-gestartet\/","title":{"rendered":"Alpine solar project launched over 2000 metres"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.axpo.com\/\" target=\"_blank\" rel=\"noopener\">Axpo<\/a>, based in Baden, has commissioned <a href=\"https:\/\/www.strabag.ch\/\" target=\"_blank\" rel=\"noopener\">STRABAG<\/a> to realise an alpine solar project next to the Lai da Nalps reservoir above the village of Serdun in Graub&uuml;nden. Around 1,500 solar panels and a technology centre will be installed in the NalpSolar project at over 2,000 metres above sea level, the Schlieren-based construction company <a href=\"https:\/\/www.strabag.ch\/aktuelles\/2025-08\/wie-strabag-auf-2000-metern-die-pfeiler-fuer-klimafreundlichen-strom-in-der-schweiz-setzt\" target=\"_blank\" rel=\"noopener\">announced<\/a> in a <a href=\"https:\/\/www.strabag.ch\/aktuelles\/2025-08\/wie-strabag-auf-2000-metern-die-pfeiler-fuer-klimafreundlichen-strom-in-der-schweiz-setzt\" target=\"_blank\" rel=\"noopener\">press release<\/a>. The first 10 per cent of the plant is due to go into operation this December.<\/p>\n<p class=\"bodytext\">&ldquo;The construction work is technically demanding, logistically challenging and ecologically sensitive, but above all a milestone for the energy transition in Switzerland,&rdquo; writes STRABAG. The individual solar tables and other components have to be transported along a narrow, single-lane mountain road. The road, which is normally closed, was built by Axpo in the 1960s as an access road for the reservoir.<\/p>\n<p class=\"bodytext\">As there are no storage facilities on the construction site, only the material that is immediately needed is transported. &ldquo;The logistics now run like clockwork,&rdquo; explains construction foreman Fran&ccedil;ois Borner in the press release. &ldquo;Instead of being stressful, it is now easy to plan.&rdquo; In the press release, STRABAG cites the uneven ground and respect for the nature conservation zones in the construction area as further challenges in the project.<\/p>\n<p class=\"bodytext\">Due to the altitude, NalpSolar will produce a lot of electricity, especially in the winter months, explains STRABAG. The construction company is aiming to complete the work in 2028. The electricity from NalpSolar is reserved for the <a href=\"https:\/\/company.sbb.ch\/de\/home.html\" target=\"_blank\" rel=\"noopener\">SBB<\/a> power grid for the next 20 years.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>STRABAG is realising the NalpSolar project in Graub\u00fcnden for Axpo. An alpine solar plant with a technology centre is being built here next to the Lai da Nalps reservoir above Serdun. The first electricity is expected to flow as early as December 2025.<\/p>\n","protected":false},"author":2,"featured_media":136702,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12482,12476,12485,22698],"tags":[15289,14355,12932,12525,12526,53911,12528,12529,14771,37205,20500],"class_list":["post-136707","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-immonews","category-projects-en","category-sustainability","tag-alpinsolar-en","tag-axpo-en","tag-graubuenden-en","tag-immoinvest-en","tag-immonews-en","tag-lai-da-nalps-en","tag-news-en","tag-photovoltaik-en","tag-sbb-en","tag-solarprojekt-en","tag-strabag-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"STRABAG is realising the NalpSolar project in Graub\u00fcnden for Axpo. An alpine solar plant with a technology centre is being built here next to the Lai da Nalps reservoir above Serdun. The first electricity is expected to flow as early as December 2025.\r\n","autor":"ce\/hs","ort":"Schlieren ZH\/Baden AG ","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2025\/08\/banoviag_high_alpine_solar_power_plant_under_construction_sno_f2aa6a9f-bf98-4476-8246-a5f6544b4df2_2-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/136707","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=136707"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/136707\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/136702"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=136707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=136707"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=136707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}