{"id":137417,"date":"2025-08-20T09:00:00","date_gmt":"2025-08-20T07:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=137417"},"modified":"2025-08-15T09:20:50","modified_gmt":"2025-08-15T07:20:50","slug":"robotersystem-optimiert-aufzugsmontage-in-singapur","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/robotersystem-optimiert-aufzugsmontage-in-singapur\/","title":{"rendered":"Robot system optimises lift installation in Singapore"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.schindler.ch\/de.html\" target=\"_blank\" rel=\"noopener\">Schindler&rsquo;s<\/a> robotic installation system for lifts, <a href=\"https:\/\/group.schindler.com\/en\/company\/innovations\/schindler-rise.html\" target=\"_blank\" rel=\"noopener\">Schindler R.I.S.E<\/a>, has been used in the new Shaw Tower in Singapore. As the Ebikon-based company reports in a <a href=\"https:\/\/www.linkedin.com\/feed\/update\/urn:li:activity:7358723521142820864\/#\" target=\"_blank\" rel=\"noopener\"><span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;LinkedIn&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Social-Media-Plattform f&uuml;r Fach- und F&uuml;hrungskr&auml;fte&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">LinkedIn<\/span><\/a> post, the robot plays a key role in the installation by reducing manual labour, improving site safety and increasing the overall efficiency of the installation process. The self-climbing robot autonomously performs installation steps such as drilling and placing anchor bolts.<\/p>\n<p class=\"bodytext\">With the R.I.S.E system, installation steps can be completed faster than with conventional installation methods. While the system works independently and requires no operation, a camera mounted on the platform enables remote monitoring. In addition, a Schindler R.I.S.E operator remains on site during the installation period for quality control and support.<\/p>\n<p class=\"bodytext\">&ldquo;Schindler R.I.S.E is now being used successfully on numerous construction sites around the world. It has not only impressed customers and colleagues with its unrivalled speed and accuracy, but has also drastically improved working conditions for our employees. It is <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Innovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Innovation in der heutigen Immobilienwelt bedeutet vor allem Digitalisierung von Prozessen. Zum Beispiel das Eliminieren von Tausenden von Excel-Bl&auml;ttern f&uuml;r Portfolio- und Asset-Manager oder das Erstellen einer Anwendung (App) f&uuml;r alle Formalit&auml;ten rund um die Beziehung zwischen Immobilieneigent&uuml;mern, - verwaltung und -mietern.&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">innovation<\/span> at its best,&rdquo; says Urs P&uuml;ntener, Head of Global Fulfilment at the Schindler Group, via the company website.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Schindler R.I.S.E, a robotic installation system for lifts, has been installed in the new Shaw Tower in Singapore. Schindler&#8217;s installation system reduces manual labour and improves safety and overall efficiency on the construction site.<\/p>\n","protected":false},"author":2,"featured_media":137410,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22697,22358,12476,12483],"tags":[54066,54067,25832,12525,12526,12528],"class_list":["post-137417","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company","category-construction","category-immonews","category-proptech-en","tag-aufzugsmontage-en","tag-baustellenrobotik-en","tag-effizienzsteigerung-en","tag-immoinvest-en","tag-immonews-en","tag-news-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Schindler R.I.S.E, a robotic installation system for lifts, has been installed in the new Shaw Tower in Singapore. Schindler's installation system reduces manual labour and improves safety and overall efficiency on the construction site.\r\n","autor":"ce\/nta","ort":"Ebikon LU\/Singapur ","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2025\/08\/banoviag_Futuristic_construction_site_in_a_modern_high-rise_b_0c860131-b938-4147-9b25-98b46440df71_0-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/137417","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=137417"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/137417\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/137410"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=137417"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=137417"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=137417"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}