{"id":140670,"date":"2025-10-02T12:20:00","date_gmt":"2025-10-02T10:20:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=140670"},"modified":"2025-10-01T08:53:12","modified_gmt":"2025-10-01T06:53:12","slug":"helikopter-einsatz-fuer-klimafreundliche-energieversorgung","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/helikopter-einsatz-fuer-klimafreundliche-energieversorgung\/","title":{"rendered":"Helicopter deployment for climate-friendly energy supply"},"content":{"rendered":"<p class=\"bodytext\">The <a href=\"https:\/\/www.swissmedical.net\/en\/hospitals\/valmont\" target=\"_blank\" rel=\"noopener\">Clinique Valmont<\/a> in Montreux has been equipped with a climate-friendly heat supply system by <a href=\"https:\/\/www.bruggpipes.com\/\" target=\"_blank\" rel=\"noopener\">BRUGG Pipes<\/a>. It consists of a Siemens air heat pump, which is connected to the clinic via a district heating pipe, BRUGG Pipes explains in a press release. The heating capacity of the system is estimated at 321 kilowatts. With the new sustainable heat supply, the clinic, which is part of the <a href=\"https:\/\/www.swissmedical.net\/de\" target=\"_blank\" rel=\"noopener\">Swiss Medical Network<\/a>, will be able to avoid around 263 tonnes of CO2 emissions every year.<\/p>\n<p class=\"bodytext\">BRUGG Pipes took an unusual approach to the delivery of the district heating pipe. &ldquo;As space was limited and an incline had to be negotiated between the unloading and installation sites, we used a helicopter to transport the four sections, each weighing around 700 kilograms,&rdquo; said Ren&eacute; Hilty, Project Manager Specialist Construction Planning at the company, which is part of <a href=\"https:\/\/www.brugg.com\/\" target=\"_blank\" rel=\"noopener\">BRUUG GROUP AG<\/a> in Brugg, in the press release. The Siemens heat pump even weighs 2.8 tonnes. It will be transported by a Super Puma helicopter on 30 September.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>BRUGG Pipes has installed a sustainable heat supply system at the Clinique Valmont. It consists of an air heat pump with a pipe to the clinic. Due to the space available, both had to be delivered by helicopter.<\/p>\n","protected":false},"author":2,"featured_media":140665,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12482,12476,12485,22698],"tags":[45814,13574,54839,12525,12526,54840,12528,23626],"class_list":["post-140670","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-immonews","category-projects-en","category-sustainability","tag-co2-reduktion-2-en","tag-fernwaerme-en","tag-helikoptereinsatz","tag-immoinvest-en","tag-immonews-en","tag-montreux","tag-news-en","tag-waermepumpe-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"BRUGG Pipes has installed a sustainable heat supply system at the Clinique Valmont. It consists of an air heat pump with a pipe to the clinic. Due to the space available, both had to be delivered by helicopter.","autor":"ce\/hs","ort":"Kleind\u00f6ttingen\/Brugg AG\/Montreux VD","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2025\/09\/banoviag_Helicopter_transporting_heavy_heat_pump_equipment_in_da681cff-b678-42d4-be14-101c2f96d826_2-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/140670","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=140670"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/140670\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/140665"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=140670"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=140670"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=140670"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}