{"id":144578,"date":"2025-11-27T14:00:00","date_gmt":"2025-11-27T13:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=144578"},"modified":"2025-11-26T13:37:51","modified_gmt":"2025-11-26T12:37:51","slug":"moderner-logistikbau-setzt-auf-effizienz-und-nachhaltigkeit","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/moderner-logistikbau-setzt-auf-effizienz-und-nachhaltigkeit\/","title":{"rendered":"Modern logistics construction focuses on efficiency and sustainability"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.transstahl.ch\/de\/\" target=\"_blank\" rel=\"noopener\">Transstahl AG<\/a>, which belongs to <a href=\"https:\/\/www.pestalozzi.com\/de\/\" target=\"_blank\" rel=\"noopener\">Pestalozzi<\/a>, is to be able to transport long and bulky goods even more efficiently and flexibly throughout Switzerland in future. The Pestalozzi Group is therefore building a new logistics center in Pieterlen, for which the ground-breaking ceremony has now been held, according to a <a href=\"https:\/\/www.presseportal.ch\/de\/pm\/100019249\/100936546\" target=\"_blank\" rel=\"noopener\">press release<\/a>. In addition to representatives from Pestalozzi and Transstahl, Beat R&uuml;fli, Mayor of Pieterlen, and Simon Enderli, Head of Location Promotion for the Canton of Bern, as well as other guests also took part in the ceremony.<\/p>\n<p class=\"bodytext\">The logistics center will be 100 meters long, 30 meters wide and 12 meters high. An energy-efficient heating system is planned, as well as a photovoltaic system and charging stations for electric trucks and cars. A large proportion of the materials used come from the Pestalozzi Group, which specializes in steel technology and building services.<\/p>\n<p class=\"bodytext\">&ldquo;With this ground-breaking ceremony, we are investing in the development of our group of companies and making a clear commitment to Switzerland as a business location and to working in partnership with municipalities and regions,&rdquo; Matthias Pestalozzi is quoted as saying in the press release. He is the owner and Delegate of the Board of Directors of the Pestalozzi Group.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Dietiker Pestalozzi Group has started the construction of its new logistics center in Pieterlen with a ground-breaking ceremony. Among other things, this is intended to secure the long-term growth of Transstahl AG, which belongs to Pestalozzi.<\/p>\n","protected":false},"author":2,"featured_media":144579,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12495,22697,22358,12476,39679],"tags":[12525,12526,19147,50978,12528,55514],"class_list":["post-144578","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-region-bern-en","category-company","category-construction","category-immonews","category-standorte-en","tag-immoinvest-en","tag-immonews-en","tag-logistikzentrum-en","tag-nachhaltige-bauweise-en","tag-news-en","tag-transportinfrastruktur"],"acf":{"bild_mit_ki_erstellt_worden":["Ja"],"lead":"The Dietiker Pestalozzi Group has started the construction of its new logistics center in Pieterlen with a ground-breaking ceremony. Among other things, this is intended to secure the long-term growth of Transstahl AG, which belongs to Pestalozzi.","autor":"ce\/jh","ort":"Dietikon ZH\/Pieterlen BE","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2025\/11\/immo-invest-standorte-bauwirtschaft-unternehmen-logistikzentrum-nachhaltigebauweise-transportinfrastruktur-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/144578","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=144578"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/144578\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/144579"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=144578"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=144578"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=144578"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}