{"id":152144,"date":"2026-03-27T16:20:00","date_gmt":"2026-03-27T15:20:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=152144"},"modified":"2026-03-26T08:45:55","modified_gmt":"2026-03-26T07:45:55","slug":"neuer-waermeverbund-nutzt-abwaerme-und-rheinwasser-effizient","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/neuer-waermeverbund-nutzt-abwaerme-und-rheinwasser-effizient\/","title":{"rendered":"New district heating network makes efficient use of waste heat and water from the Rhine"},"content":{"rendered":"<p class=\"bodytext\">According to a <a href=\"https:\/\/www.aew.ch\/news\/aew-startet-bau-des-nachhaltigen-waermeverbunds-augst\" target=\"_blank\" rel=\"noopener\">press release<\/a>, energy supplier <a href=\"http:\/\/www.aew.ch\" target=\"_blank\" rel=\"noopener\">AEW Energie AG<\/a> is investing 8 million Swiss francs in the construction of a district heating network in Augst, in the canton of Basel-Landschaft. According to the company, this sends &ldquo;a clear signal regarding the implementation of the energy strategy and the consistent expansion of renewable heating solutions&rdquo;.<\/p>\n<p class=\"bodytext\">Waste heat from the generators at the existing Augst hydroelectric power station and water from the Rhine are to be used for district heating. It is stated that, via a 1.3-kilometre-long district heating network, the connected buildings will receive CO2-free energy from the start of the 2026\/2027 heating season.<\/p>\n<p class=\"bodytext\">Three heat storage tanks, each with a capacity of 15,000 litres, will ensure a secure supply and reliable, stable operation even during peak loads. According to the press release, the plant&rsquo;s thermal output is 2 megawatts and is expected to deliver a heat output of 4,400 megawatt-hours once fully operational. This is expected to save 1,200 tonnes of CO2 annually.<\/p>\n<p class=\"bodytext\">At the start of the construction project with the ground-breaking ceremony on 16 March 2026, the company announced that it was creating a replacement for the AEW <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Contracting&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Gesamt&uuml;bernahme von Projektierung, Erstellung, Betrieb, Unterhalt und Finanzierung eines Bau- oder Anlageteils durch einen Unternehmer und dessen Zurverf&uuml;gungstellung gegen Entgelt (z.B. Energie-Contracting)&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Contracting<\/span> plant in Pratteln, which had been operated using wood pellets and oil. &ldquo;With the Augst heating network, we are making optimal use of existing energy sources from our own infrastructure and making an important contribution to the decarbonisation of the region&rsquo;s heat supply,&rdquo; said Dr Raffael Schubiger, Chairman of the Board of Directors of AEW Energie AG and Kraftwerk Augst AG.<\/p>\n<p class=\"bodytext\">According to David Gautschi, Head of Production at AEW, the Augst heating network exemplifies how existing energy infrastructure and natural resources can be efficiently combined.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>AEW Energie AG has begun construction of a district heating network in Augst. With an investment of 8 million Swiss francs, AEW aims to ensure a sustainable heat supply for the region from the 2026\/2027 heating season onwards. The plant is expected to reduce CO2 emissions by 1,200 tonnes per year.<\/p>\n","protected":false},"author":2,"featured_media":152145,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12482,12476,12489,22698],"tags":[58005,55554,12525,12526,12528,55897],"class_list":["post-152144","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-immonews","category-new-construction","category-sustainability","tag-abwaermenutzung-2","tag-fernwaerme-3","tag-immoinvest-en","tag-immonews-en","tag-news-en","tag-waermeverbund-2"],"acf":{"bild_mit_ki_erstellt_worden":["Ja"],"lead":"AEW Energie AG has begun construction of a district heating network in Augst. With an investment of 8 million Swiss francs, AEW aims to ensure a sustainable heat supply for the region from the 2026\/2027 heating season onwards. The plant is expected to reduce CO2 emissions by 1,200 tonnes per year.","autor":"ce\/heg","ort":"Aarau\/Augst BL","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2026\/03\/banoviag_district_heating_infrastructure_near_river_in_Switze_7533a7b7-d3e4-4775-8f42-e641fabd8125_2-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/152144","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=152144"}],"version-history":[{"count":2,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/152144\/revisions"}],"predecessor-version":[{"id":152153,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/152144\/revisions\/152153"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/152145"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=152144"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=152144"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=152144"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}