{"id":154099,"date":"2026-04-22T16:20:00","date_gmt":"2026-04-22T14:20:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=154099"},"modified":"2026-04-17T10:33:55","modified_gmt":"2026-04-17T08:33:55","slug":"infrastrukturmassnahmen-meistern-komplexes-terrain-am-zuerichsee","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/infrastrukturmassnahmen-meistern-komplexes-terrain-am-zuerichsee\/","title":{"rendered":"Infrastructure works tackle challenging terrain on Lake Zurich"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.walo.ch\/de-ch\/\" target=\"_blank\" rel=\"noopener\">Walo Bertschinger AG<\/a>, a family-run construction firm based in Dietikon, is carrying out the roadworks and civil engineering works as part of an infrastructure project in the Lake Zurich region. According to a <a href=\"https:\/\/www.facebook.com\/walo.bertschinger\/posts\/1581442383985378?ref=embed_post\" target=\"_blank\" rel=\"noopener\">press release<\/a>, over a stretch of 1.1 kilometres between T&auml;gerst and Buchenegg, &ldquo;roads, drainage systems and numerous engineering structures are being newly constructed, reinforced or repaired.&rdquo; The project is scheduled for completion by 2027.<\/p>\n<p class=\"bodytext\">A central element of the project is the construction of two new Lehnen viaducts, measuring 90 and 130 metres in length. A total of 21 piers and around 240 micropiles will provide a solid foundation on the landslide-prone slope.<\/p>\n<p class=\"bodytext\">&ldquo;Limited space, steep terrain and a tight schedule make this project particularly challenging,&rdquo; explains Walo Bertschinger AG in the press release. &ldquo;We are therefore all the more pleased that the work is progressing according to plan and that the team is delivering a strong <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Performance&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Wertentwicklung eines Portfolios&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">performance<\/span> in their daily work.&rdquo;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Walo Bertschinger AG is involved in an infrastructure project between T\u00e4gerst and Buchenegg. By the end of 2027, a road, drainage systems and engineering structures will be newly constructed or reinforced there. Two new Lehnen viaducts, measuring 90 and 130 metres in length, are also central to the project.<\/p>\n","protected":false},"author":2,"featured_media":154100,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22358,12476,12489,12485],"tags":[12525,12526,12528,13598,58522,58523],"class_list":["post-154099","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-immonews","category-new-construction","category-projects-en","tag-immoinvest-en","tag-immonews-en","tag-news-en","tag-strassenbau-en","tag-tiefbauprojekt","tag-viaduktbau"],"acf":{"bild_mit_ki_erstellt_worden":["Ja"],"lead":"Walo Bertschinger AG is involved in an infrastructure project between T\u00e4gerst and Buchenegg. By the end of 2027, a road, drainage systems and engineering structures will be newly constructed or reinforced there. Two new Lehnen viaducts, measuring 90 and 130 metres in length, are also central to the project.","autor":"ce\/nta","ort":"Dietikon ZH ","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2026\/04\/banoviag_road_construction_project_in_steep_alpine_terrain_ne_3ae3c415-22a2-4a55-aa01-d645ef672285_2-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/154099","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=154099"}],"version-history":[{"count":2,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/154099\/revisions"}],"predecessor-version":[{"id":154108,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/154099\/revisions\/154108"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/154100"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=154099"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=154099"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=154099"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}