{"id":162805,"date":"2026-08-14T10:00:00","date_gmt":"2026-08-14T08:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=162805"},"modified":"2026-08-12T16:05:56","modified_gmt":"2026-08-12T14:05:56","slug":"basel-kippt-eine-rampe-ins-wasser","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/basel-kippt-eine-rampe-ins-wasser\/","title":{"rendered":"Basel is lowering a ramp into the water"},"content":{"rendered":"<p>With the start of construction at the Dreispitz, the redevelopment of the site is moving from the planning stage into reality. A disused railway ramp there is being transformed into a 170-metre-long natural swimming pool, with the removed rails being reused along the perimeter of the pool as the supporting structure for the wooden jetty.<\/p>\n<p>The project is more than just a leisure initiative. The &lsquo;Gleispool&rsquo; is part of the ongoing transformation of the approximately 50-hectare Dreispitz site, which Basel and M&uuml;nchenstein are redeveloping in phases in collaboration with the Christoph Merian Foundation. The pool occupies a former transport area on the &lsquo;Kulturmeile&rsquo; and demonstrates how open space, recreational areas and new uses are to be integrated into the existing fabric.<\/p>\n<p><strong>Re-Use is being built<br><\/strong>The investment costs amount to 8.8 million Swiss francs. The facility is due to open in summer 2027. The plan is to create a natural swimming pool with sports and leisure areas within a former railway ramp. According to the project specifications, the depth in the swimming area reaches up to 4.5 metres. The reuse of the existing infrastructure is not a minor detail, but rather the defining design principle of the project.<\/p>\n<p><strong>Biological rather than chemical<br><\/strong>The Gleispool is to be operated without chemical additives. Water purification is carried out biologically via multi-stage filters containing sediment and plants. The surrounding area has also been designed with functionality in mind. Ground structures and planting follow the &lsquo;sponge city&rsquo; principle, enabling water to be stored, evaporated and allowed to seep away locally.<\/p>\n<p><strong>Open space for the new Dreispitz<br><\/strong>The facility is particularly relevant to the site&rsquo;s development because it does not merely illustrate a future use, but actually anticipates it in concrete terms. The Dreispitz was long used for logistics and commercial purposes. Now, a disused ramp is being transformed into a public leisure and sports venue in the heart of an area that is set to be gradually densified, greened and put to mixed-use.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Construction has begun at the Dreispitz, transforming disused railway infrastructure into a 170-metre-long natural swimming pool. The \u2018Gleispool\u2019 is costing 8.8 million Swiss francs, is due to open in summer 2027 and marks a significant step in the redevelopment of the approximately 50-hectare site.<\/p>\n","protected":false},"author":2,"featured_media":162806,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12494,55990,56026,22698],"tags":[55474,36335,61096,12525,12526,61097,12528,54637,15705],"class_list":["post-162805","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-region-basel-en","category-districts-areas","category-planning-development","category-sustainability","tag-arealtransformation","tag-dreispitz-en","tag-gleispool","tag-immoinvest-en","tag-immonews-en","tag-naturbad","tag-news-en","tag-re-use-en","tag-schwammstadt-en"],"acf":{"bild_mit_ki_erstellt_worden":["Ja"],"lead":"Construction has begun at the Dreispitz, transforming disused railway infrastructure into a 170-metre-long natural swimming pool. The \u2018Gleispool\u2019 is costing 8.8 million Swiss francs, is due to open in summer 2027 and marks a significant step in the redevelopment of the approximately 50-hectare site.","autor":"","ort":"","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"3620","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2026\/08\/Basel-kippt-eine-Rampe-ins-Wasser-immo-invest-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/162805","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=162805"}],"version-history":[{"count":2,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/162805\/revisions"}],"predecessor-version":[{"id":162814,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/162805\/revisions\/162814"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/162806"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=162805"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=162805"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=162805"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}