{"id":21878,"date":"2021-07-08T12:00:00","date_gmt":"2021-07-08T10:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/hkg-hat-zu-neuem-kongresshaus-beigetragen\/"},"modified":"2021-09-14T13:52:28","modified_gmt":"2021-09-14T11:52:28","slug":"hkg-hat-zu-neuem-kongresshaus-beigetragen","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/hkg-hat-zu-neuem-kongresshaus-beigetragen\/","title":{"rendered":"HKG contributed to the new congress center"},"content":{"rendered":"<p class=\"bodytext\">As part of the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> project of the Kongresshaus and Tonhalle Zurich, the latest technology has been installed, according to a <a href=\"https:\/\/www.hkg.ch\/ueber-uns\/news\/detail\/kongresshaus-zuerich\/\" target=\"_blank\" rel=\"noopener\">communication<\/a> from <a href=\"https:\/\/www.hkg.ch\/\" target=\"_blank\" rel=\"noopener\">HKG Engineering<\/a> . The company's Schlierem representative was <a href=\"https:\/\/www.hkg.ch\/ueber-uns\/news\/detail\/instandsetzung-kongresshaus-und-tonhalle-zuerich\/\" target=\"_blank\" rel=\"noopener\">entrusted<\/a> with the electrical engineering. The challenge was to keep the original as much as possible, while new parts and additions were to be adapted to the existing stock.<\/p>\n<p class=\"bodytext\"> Thanks to the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span>, the Kongresshaus, which opened in 1939, and the Tonhalle Zurich are now ready for the next 50 years. An area of 5300 square meters is available for events. There is space for 4500 visitors in the premises. The flexible space available means that various events such as specialist congresses or meetings can be held. According to HKG, the congress center is also climate neutral.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Kongresshaus und Tonhalle Z\u00fcrich sind saniert worden. Die ersten gr\u00f6sseren Veranstaltungen sollen ab August stattfinden. HKG Engineering war an dem Sanierungsprojekt beteiligt.<\/p>\n","protected":false},"author":2,"featured_media":21881,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22358],"tags":[12536,13414,12525,12526,13415,12528,13416],"class_list":["post-21878","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","tag-bauwesen-en","tag-hkg-en","tag-immoinvest-en","tag-immonews-en","tag-kongresshaus-en","tag-news-en","tag-tonhalle-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Zurich Congress Center and Tonhalle have been refurbished. The first major events are to take place from August. HKG Engineering was involved in the renovation project.","autor":"jh","ort":"Schlieren ZH","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2021\/03\/energie-23-150x150.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/21878","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=21878"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/21878\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/21881"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=21878"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=21878"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=21878"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}