{"id":21954,"date":"2021-07-07T12:00:00","date_gmt":"2021-07-07T10:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/swica-und-steiner-bauen-in-aarau\/"},"modified":"2021-09-14T14:08:01","modified_gmt":"2021-09-14T12:08:01","slug":"swica-und-steiner-bauen-in-aarau","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/swica-und-steiner-bauen-in-aarau\/","title":{"rendered":"Swica and Steiner build in Aarau"},"content":{"rendered":"<p class=\"bodytext\">The health organization <a href=\"https:\/\/www.swica.ch\/\" target=\"_blank\" rel=\"noopener\">Swica<\/a> from Winterthur and <a href=\"https:\/\/www.steiner.ch\/\" target=\"_blank\" rel=\"noopener\">Steiner AG<\/a> from Zurich want to realize a mixed-use development in the Aarau district of Scheibenschachen, Steiner informs in a <a href=\"https:\/\/www.steiner.ch\/de\/mediencenter\/news\/detail\/news\/523-swica-und-steiner-ag-unterzeichnen-projektentwicklungsvertrag-fuer-wohn-und-gewe.html\" target=\"_blank\" rel=\"noopener\">press release<\/a> . Three buildings with a total of around 90 rental and owner-occupied apartments as well as commercial space are to be erected on an area of around 4,000 square meters. A building worthy of protection that is already on the site will be integrated into the project, explains the Zurich-based project development, total and general contractor.<\/p>\n<p class=\"bodytext\"> In a first step, the two partner companies want to carry out a study contract for the development of a project plan. It should then be specified and submitted for approval. Construction is scheduled to start in 2023. The construction work should be completed by the end of 2025.<\/p>\n<p class=\"bodytext\"> The Scheibenschachen district, which is within walking distance of the historic center of Aarau, has developed &quot;into a popular residential area&quot; over the years, Steiner writes in the press release. According to her, the Zurich-based company has already built two more large residential developments in Scheibenschachen.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Swica und Steiner haben einen Vertrag zur Projektentwicklung f\u00fcr eine \u00dcberbauung im Aarauer Quartier Scheibenschachen unterzeichnet. Hier sollen rund 90 Wohnungen sowie Gewerbefl\u00e4chen entstehen. Der Baubeginn ist f\u00fcr 2023 vorgesehen. <\/p>\n","protected":false},"author":2,"featured_media":21955,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12491,12476,12489,12485,12487],"tags":[13531,12533,12535,12564,12526,12591,12528,13532,13533],"class_list":["post-21954","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aargau-en","category-immonews","category-new-construction","category-projects-en","category-regions-en","tag-aarau-en","tag-bau-en","tag-bauen-en","tag-immobilien-en","tag-immonews-en","tag-neubau-en","tag-news-en","tag-scheibenschachen-en","tag-swica-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Swica and Steiner have signed a project development contract for a development in the Aarau district of Scheibenschachen. Around 90 apartments and commercial space are to be created here. Construction is scheduled to start in 2023.","autor":"hs","ort":"Aarau","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2021\/07\/bauen-19-150x150.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/21954","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=21954"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/21954\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/21955"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=21954"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=21954"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=21954"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}