{"id":22941,"date":"2021-03-07T08:00:00","date_gmt":"2021-03-07T07:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/kantonsspital-baden-installiert-solarstromanlage\/"},"modified":"2021-09-21T10:20:27","modified_gmt":"2021-09-21T08:20:27","slug":"kantonsspital-baden-installiert-solarstromanlage","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/kantonsspital-baden-installiert-solarstromanlage\/","title":{"rendered":"Baden Cantonal Hospital installs solar power system"},"content":{"rendered":"<p class=\"bodytext\">The <a href=\"https:\/\/www.kantonsspitalbaden.ch\/\" target=\"_blank\" rel=\"noopener\">Kantonsspital Baden<\/a> (KSB) relies on renewable energy and has therefore had solar power systems installed for self-sufficiency. On an area of 2000 square meters, solar panels have been installed on the roofs of the parking garage and the heating center and also on the facade of the heating building. <a href=\"https:\/\/www.kantonsspitalbaden.ch\/Meta\/News-Detail-Seite_70464.html\" target=\"_blank\" rel=\"noopener\">According to a media release<\/a> from KSB, the new solar power generators have a total output of 375 megawatt hours of electricity. This corresponds to 3 percent of KSB's electricity requirements. The new solar systems are to be connected to the power supply network for the canton hospital at the end of this month.<\/p>\n<p class=\"bodytext\"> Cristoffel Schwarz, the chief manager (COO) of KSB, is quoted as saying: &ldquo;The areas on the P2 multi-storey car park and the heating plant are predestined for the production of solar power. That is why we decided to make this investment. The KSB will thus become a small power plant itself. &quot;<\/p>\n","protected":false},"excerpt":{"rendered":"<p> Das Kantonsspital Baden hat auf den D\u00e4chern des Parkhauses und der Heizzentrale und deren Fassade Solarpaneele installiert. Damit soll ein kleiner Teil des hauseigenen Energiebedarfs gedeckt werden.<\/p>\n","protected":false},"author":2,"featured_media":21405,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12482,12476],"tags":[14895,12520,12521,14896,12525,12526,14897,14898,12528,14899,14901,14903,14904],"class_list":["post-22941","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-immonews","tag-eigenversorgung-en","tag-energie-en","tag-erneuerbareenergien-en","tag-heizzentrale-en","tag-immoinvest-en","tag-immonews-en","tag-kantonsspital-baden-en","tag-ksb-en","tag-news-en","tag-parkhaus-en","tag-solarpaneele-en","tag-solarstromanlage-en","tag-solarstromanlagen-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Baden Cantonal Hospital installed solar panels on the roofs of the car park and the heating center and their fa\u00e7ades. This is intended to cover a small part of the in-house energy requirement.","autor":"gba","ort":"Baden AG","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2020\/07\/energie_7-1-150x150.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/22941","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=22941"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/22941\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/21405"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=22941"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=22941"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=22941"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}