{"id":23095,"date":"2021-02-04T15:31:12","date_gmt":"2021-02-04T14:31:12","guid":{"rendered":"https:\/\/www.immo-invest.ch\/hirslanden-klinik-st-anna-wird-erneuert\/"},"modified":"2021-09-21T15:01:14","modified_gmt":"2021-09-21T13:01:14","slug":"hirslanden-klinik-st-anna-wird-erneuert","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/hirslanden-klinik-st-anna-wird-erneuert\/","title":{"rendered":"Hirslanden Klinik St. Anna is being renewed"},"content":{"rendered":"<p class=\"bodytext\">The <a href=\"https:\/\/www.hirslanden.ch\/de\/klinik-st--anna\/home.html\" target=\"_blank\" rel=\"noopener\">Hirslanden Klinik St. Anna<\/a> in Lucerne will start renovating its infrastructure in March. This emerges from a <a href=\"https:\/\/www.linkedin.com\/posts\/hirslanden_bauprojekt-annaplus-activity-6762362211634577409-iLX8\" target=\"_blank\" rel=\"noopener\">message from<\/a> the clinic on <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;LinkedIn&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Social-Media-Plattform f&uuml;r Fach- und F&uuml;hrungskr&auml;fte&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">LinkedIn<\/span>. Initially, work is being carried out on an extension (wing G), which will be located in the area of today's inner courtyard between the car park and the clinic. Among other things, the Institute for Radiology and Nuclear Medicine will be located there.<\/p>\n<p class=\"bodytext\"> From 2023, as part of a second phase, the demolition of two parts of the building is to start, some of which date from the early days of the clinic. These parts of the building will be replaced by a new building (wing A +). This is to become the new heart of future clinic operations.<\/p>\n<p class=\"bodytext\"> The entire construction project should be completed in 2027. According to an <a href=\"https:\/\/www.luzernerzeitung.ch\/zentralschweiz\/luzern\/luzern-privatklinik-stanna-investiert-ueber-100-millionen-franken-in-erweiterung-und-neubau-ld.2093460\" target=\"_blank\" rel=\"noopener\">article in<\/a> the &ldquo;Luzerner Zeitung&rdquo;, Hirslanden is investing a total of more than 100 million francs in the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span>.<\/p>\n<p class=\"bodytext\"> &quot;With the construction project we are building a bridge to the future,&quot; said clinic director Martin Nufer in the article in the &quot;Luzerner Zeitung&quot;. The investment also makes it possible to close supply gaps. &ldquo;In oncology, for example, thanks to the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span>, we can finally also offer radiotherapy, which requires special equipment and facilities. We simply didn't have enough space in today's building, &rdquo;says Nufer.<\/p>\n<p class=\"bodytext\"> The St. Anna Clinic in Lucerne was founded in 1911 by the St. Anna Sisters community and has been part of the Hirslanden Private Clinic Group since 2005.<\/p>\n","protected":false},"excerpt":{"rendered":"<p> Die Hirslanden Klinik St. Anna investiert \u00fcber 100 Millionen Franken in die Erneuerung ihres Standortes in Luzern. Im M\u00e4rz sollen die Bauarbeiten beginnen. Die Investition wird auch neue Angebote erm\u00f6glichen, f\u00fcr die es spezielle R\u00e4umlichkeiten braucht.<\/p>\n","protected":false},"author":2,"featured_media":21756,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12490,12493],"tags":[12533,12535,13352,15156,14501,15157,12525,12526,15158,15159,12909,12591,12528,14899],"class_list":["post-23095","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-refurbishment","category-region-zurich-en","tag-bau-en","tag-bauen-en","tag-bauprojekt-en","tag-erweiterungsbau-en","tag-gesundheitswesen-en","tag-hirslanden-klinik-st-anna-en","tag-immoinvest-en","tag-immonews-en","tag-innenhof-en","tag-klinik-en","tag-luzern-en","tag-neubau-en","tag-news-en","tag-parkhaus-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Hirslanden Klinik St. Anna is investing over 100 million francs in the renovation of its location in Lucerne. Construction work is scheduled to begin in March. The investment will also enable new offers that require special premises.","autor":"ssp","ort":"Luzern","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2020\/12\/bauen-11-150x150.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/23095","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=23095"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/23095\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/21756"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=23095"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=23095"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=23095"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}