{"id":24968,"date":"2021-10-11T17:00:00","date_gmt":"2021-10-11T15:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/bauen-fuer-die-zhaw-in-winterthur\/"},"modified":"2021-10-14T11:08:56","modified_gmt":"2021-10-14T09:08:56","slug":"bauen-fuer-die-zhaw-in-winterthur","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/bauen-fuer-die-zhaw-in-winterthur\/","title":{"rendered":"Building for the ZHAW in Winterthur"},"content":{"rendered":"<p class=\"wp-block-paragraph\"> <strong>2021 Eulachpassage castling<\/strong><br> In summer 2020, the ZHAW Health Department will move from the Eulachpassage to the new Adeline Favre building on the Sulzer site. The ZHAW School of Engineering will temporarily use the space in the Eulachpassage as a Rochade building, while the new Technikumstrasse campus will be built over the next few years.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> <strong>2023 laboratory building RD<\/strong><br> A unique center for food and beverage technology will be built on the Reidbach campus in W&auml;denswil by summer 2023. The new building not only unites the ZHAW Institute for Food and Beverage <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Innovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Innovation in der heutigen Immobilienwelt bedeutet vor allem Digitalisierung von Prozessen. Zum Beispiel das Eliminieren von Tausenden von Excel-Bl&auml;ttern f&uuml;r Portfolio- und Asset-Manager oder das Erstellen einer Anwendung (App) f&uuml;r alle Formalit&auml;ten rund um die Beziehung zwischen Immobilieneigent&uuml;mern, - verwaltung und -mietern.&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Innovation<\/span> in one place, but also the entire value chain of the food industry. In the future, food and beverages will be researched here, from raw materials to the market.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> Construction time: 2019-2023<br> Architecture: Leutwyler Partner Arch.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> <strong>2024-2034 Campus T<\/strong><br> The ZHAW School of Engineering is getting a new, attractive campus with a park on the Technikumstrasse site in Winterthur. The buildings and green space required for this will be implemented in four stages by 2035.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> The first includes the two new laboratory buildings TT (2024) and TL (2027), with laboratory, teaching and office space as well as a cafeteria and a public park with access to the Eulach. In the longer term, all buildings around the main building by Theodor Gohl (1878), which is worthy of protection, and the east building by Hermann Fietz (1908) are to be replaced by new buildings. For the second stage, the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> and densification of the building complex with the east and chemical building TE \/ TZ (2029) is planned.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> In the third stage, the historic main building TH (2032) will be renewed and expanded to the south. In the final fourth stage, the physics building is to be replaced by the new laboratory building TP (2035), provided that the old building by Hans Suter (1960) is removed from the inventory of buildings worthy of protection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> <strong>2025 Shedhalle Reidbach<\/strong><br> The ZHAW has been renting the former factory premises of the W&auml;denswil AG cloth factory since 1999. As soon as the so-called shed halls have been converted, they will be used from 2025, for example, as a new university library as well as learning and common rooms for students from the ZHAW Department of Life Sciences and Facility Management.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> Construction period: 2023-2025<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> <strong>2033-2034 Rochade Eulachpassage and meander<\/strong><br> In the long term, the ZHAW Department of Applied Linguistics will settle on the Eulachpassage and make room in the meander for the ZHAW School of Management and Law, which is to expand entirely on the St.-Georgen-Platz campus.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Expansion of the range of courses, increasing student registrations and the changing teaching methods due to digitization &#8211; this opens up the challenge and opportunity for the ZHAW to tackle spatial development. Winterthur shows where planning, building and control will take place over the next few years.<\/p>\n","protected":false},"author":2,"featured_media":24969,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12489,12485],"tags":[16812,16813,16814,16815,13277,16816,13160],"class_list":["post-24968","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-construction","category-projects-en","tag-anmeldungen-en","tag-laborneubauten-en","tag-studienangebote-en","tag-studierende-en","tag-umbau-en","tag-unterrichtsmethoden-en","tag-zhaw-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Expansion of the range of courses, increasing student registrations and the changing teaching methods due to digitization - this opens up the challenge and opportunity for the ZHAW to tackle spatial development. Winterthur shows where planning, building and control will take place over the next few years.","autor":"Text: Sabine Billeter, Image: zVg.","ort":"Winterthur ZH","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2021\/05\/business-3-e1622127876646-150x150.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/24968","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=24968"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/24968\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/24969"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=24968"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=24968"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=24968"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}