{"id":25028,"date":"2021-10-11T17:00:00","date_gmt":"2021-10-11T15:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/hardau-i-wird-fuer-71-millionen-franken-neu-gebaut\/"},"modified":"2021-10-14T09:30:42","modified_gmt":"2021-10-14T07:30:42","slug":"hardau-i-wird-fuer-71-millionen-franken-neu-gebaut","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/hardau-i-wird-fuer-71-millionen-franken-neu-gebaut\/","title":{"rendered":"Hardau I is being rebuilt for 71 million francs"},"content":{"rendered":"<p class=\"wp-block-paragraph\"> The aging Hardau I housing estate is located between Hardstrasse and the striking residential towers of Hardau II. It has existed since 1964 and was designed by the architect Eberhard Eidenbenz. Today&rsquo;s 80 apartments are small-scale with a modest standard of fit-out. Noise protection, energy efficiency and accessibility leave a lot to be desired. Since the area has potential to be used and more family apartments can be built as a result, the City of Zurich has decided to replace it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> In 2018, the Office for Buildings of the City of Zurich selected the winning project by means of an architecture competition: Graber Pulver Architekten AG won over the jury with their &ldquo;Laurel &amp; Hardy&rdquo; project. Two structures of different shapes and heights are planned. The six-storey courtyard building is clearly separated from the Hardau park. A seven-storey building block complements the existing block edge along Hardstrasse. Most of the apartments in the courtyard are oriented on three sides.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> 122 predominantly spacious rental apartments are planned for residents with low to medium incomes. Single rooms, studios and music practice rooms can be rented individually. Areas for services and a personal registration office are also being built along Hardstrasse on the ground floor. In addition, a kindergarten, studios and a youth shop of the Open Youth Work Zurich (OJA) are planned at Hardaupark. Together with the existing Hardau high-rises, which mostly comprise smaller apartments, a well-mixed urban housing supply is to be created.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> At Hardau I, energy parameters of the Minergie-P standard in the sense of the 2000-watt society have top priority: Nevertheless, only the construction on the noise-polluted Hardstrasse is certified according to the Minergie-P-Eco standard. Because no controlled ventilation is installed in the quieter courtyard building. The mobility concept provides for a neighborhood with little cars: The number of parking spaces will be significantly reduced to 31 instead of the previous 249. Energy is generated directly on the property by a photovoltaic system planned and financed by the city of Zurich&rsquo;s electricity company. So that the electricity produced on the roofs of the property can be used on site, tenants and property developers form a self-consumption community.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Zurich housing estate from 1964 is being completely renovated. The number of rental apartments will be increased by making better use of the area.<\/p>\n","protected":false},"author":2,"featured_media":24499,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12485,12490],"tags":[14946,16909,16910,16911,16912,13507,13090,12679,16913],"class_list":["post-25028","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects-en","category-refurbishment","tag-ateliers-en","tag-ausnutzung-en","tag-energiekennwert-en","tag-graber-pulver-architekten-ag-en","tag-hardstrasse-en","tag-hochbauten-en","tag-mietwohnung-en","tag-minergie-en","tag-wohnsiedlung-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Zurich housing estate from 1964 is being completely renovated. The number of rental apartments will be increased by making better use of the area.","autor":"Text: Linda von Euw, Image: Nightnurse Images, Zurich.","ort":"Z\u00fcrich","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2021\/10\/visualisierunghardaui-150x150.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/25028","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=25028"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/25028\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/24499"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=25028"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=25028"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=25028"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}