{"id":28910,"date":"2021-12-11T17:00:00","date_gmt":"2021-12-11T16:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=28910"},"modified":"2021-12-09T17:08:37","modified_gmt":"2021-12-09T16:08:37","slug":"steiner-ag-kann-wohnbauprojekt-haus-weiler-realisieren","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/steiner-ag-kann-wohnbauprojekt-haus-weiler-realisieren\/","title":{"rendered":"Steiner AG can realize the residential building project Haus Weiler"},"content":{"rendered":"<p class=\"bodytext\">The building permit for the new building project <a href=\"http:\/\/www.haus-weiler.ch\" target=\"_blank\" rel=\"noopener\">Haus Weiler<\/a> in Winterthur's <a href=\"https:\/\/stadt.winterthur.ch\/themen\/leben-in-winterthur\/planen-und-bauen\/gebiets-und-arealentwicklung\/neuhegi-die-neue-stadt-in-winterthur\" target=\"_blank\" rel=\"noopener\">Neuhegi<\/a> district is legally binding. As <a href=\"http:\/\/www.steiner.ch\" target=\"_blank\" rel=\"noopener\">Steiner AG<\/a> , which was commissioned with the planning, informed in a <a href=\"\/\/www.steiner.ch\/de\/mediencenter\/news\/detail\/news\/557-rechtskraft-der-baubewilligung-fuer-das-wohnbauprojekt-haus-weiler-in-winterthu.html\" target=\"_blank\" rel=\"noopener\">press release<\/a> , the first apartments should be ready for occupancy in spring 2025. Residents will find peace and quiet and close to nature, but at the same time can reach the city in around 15 minutes by bike or bus, according to the message.<\/p>\n<p class=\"bodytext\"> The new residential development will close another gap in the <a href=\"http:\/\/www.kim-winterthur.ch\" target=\"_blank\" rel=\"noopener\">KIM<\/a> area. A modern building with 80 modern apartments with two and a half to five and a half rooms is to be built on 3328 square meters. The extraordinary room heights are a special feature. &quot;While the apartments on the ground floor are equipped with private garden seating, the residential units on the top floors will impress with their large, private terraces,&quot; the company reports. The plans also provide for &ldquo;a cozy inner courtyard&rdquo;, which offers space for &ldquo;cozy get-togethers, lingering, relaxing and playing&rdquo;.<\/p>\n<p class=\"bodytext\"> The KIM quarter, launched in 2018 in the Oberwinterthur district <a href=\"http:\/\/www.kim-winterthur.ch\/areal\" target=\"_blank\" rel=\"noopener\">, sees itself<\/a> as &ldquo;a lively and multi-layered quarter with commercial and residential buildings of various sizes&rdquo;. The new district combines the advantages of urban structures with high recreational value at the same time. Green areas, playgrounds and car-free zones as well as attractive shopping opportunities in the area are named as strengths.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Die Stadt Winterthur hat die Baubewilligung f\u00fcr das Projekt Haus Weiler in Winterthur-Neuhegi erteilt. Damit kann die Steiner AG im Sommer planm\u00e4ssig mit den Bauarbeiten beginnen. Das moderne Wohngeb\u00e4ude wird Teil des KIM Areals und bietet st\u00e4dtische Infrastruktur in einer naturnahen Lage. <\/p>\n","protected":false},"author":2,"featured_media":21270,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12489,12493],"tags":[12993,14074,12536,14503,12525,12526,12859,19125,19126,19127,12528,19128,13253,14034],"class_list":["post-28910","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-construction","category-region-zurich-en","tag-bauarbeiten-en","tag-baubewilligung-en","tag-bauwesen-en","tag-haus-weiler-en","tag-immoinvest-en","tag-immonews-en","tag-infrastruktur-en","tag-kim-en","tag-kim-areal-en","tag-naturnah-en","tag-news-en","tag-sommer-en","tag-steiner-ag-it-en","tag-wohngebaeude-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The city of Winterthur has issued the building permit for the Haus Weiler project in Winterthur-Neuhegi. This means that Steiner AG can start construction work on schedule in the summer. The modern residential building becomes part of the KIM area and offers urban infrastructure in a natural location.","autor":"hg","ort":"Winterthur\/Z\u00fcrich","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2021\/03\/planung-3-150x150.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/28910","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=28910"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/28910\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/21270"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=28910"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=28910"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=28910"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}