{"id":29420,"date":"2020-10-30T12:00:00","date_gmt":"2020-10-30T11:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/eine-vielseitige-wohnsiedlung-fuer-leutschenbach\/"},"modified":"2022-01-03T16:09:25","modified_gmt":"2022-01-03T15:09:25","slug":"eine-vielseitige-wohnsiedlung-fuer-leutschenbach","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/eine-vielseitige-wohnsiedlung-fuer-leutschenbach\/","title":{"rendered":"A versatile housing estate for Leutschenbach"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The new housing estate consists of two U-shaped, seven to nine-story main buildings that are open towards Riedbach and thus create a spacious inner courtyard with parking spaces across both areas, explained the project managers. The inner courtyard is also supplemented with smaller buildings that accommodate different uses such as the four kindergartens and childcare. The new building project by Clou Architekten AG, Zurich, and Atelier Oriri Landschaftsarchitekten GmbH, Kehrsiten, won an architecture competition in 2016. The jury argued that the project impressed above all with its high space and volume efficiency, which, in addition to cost advantages, also promises energetic and operational benefits.<\/p><p class=\"wp-block-paragraph\"> <strong>The focus is on 4- to 4&frac12;-room apartments<\/strong><br> The Leutschenbach housing estate comprises 349 2- to 6&frac12;-room apartments, two <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Cluster&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Marketingbegriff f&uuml;r eine Nutzergruppe mit &auml;hnlichen Anforderungen an eine Immobilie. In der Standortf&ouml;rderung spricht man von Cluster, wenn Unternehmen aus der gleichen Branche vernetzt werden&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">cluster<\/span> apartments each with six 1- to 2-room studios, seven apartments for shared apartments, eleven two-storey residential studios and 41 rentable rooms. The housing offer is tailored to current needs in different phases of living and life. The eight large apartments and the differently designed rooms would offer flexible space for different living solutions. The proportion of 4- to 4&frac12;-room apartments is around 46 percent and thus forms the focus. The rooms for trade and services with storage space are on the ground floor. The individual rooms have an area of 20 to 130 square meters.<\/p><p class=\"wp-block-paragraph\"> <strong>Contribution to the 2000 watt society<\/strong><br> The housing estate is intended to make a contribution to the 2000 watt society with various measures. The U-shaped main building will be built according to the Minergie-P-ECO, the buildings in the inner courtyard according to the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Minergie-Eco&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Erg&auml;nzender Baustandard zum Minergie oder Minergie-P-Standard. Dabei werden Anforderungen einer gesunden und &ouml;kologischen Bauweise ber&uuml;cksichtigt&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Minergie-ECO<\/span> standard. It is planned that the heat will be supplied via the district heating network of the Hagenholz waste incineration plant and can also be supplemented by the waste heat from the neighboring data center of Schweizer Radio und Fernsehen (SRF). In addition, a photovoltaic system is to be installed on the roof for personal use. &#9632;<\/p>","protected":false},"excerpt":{"rendered":"<p>In Z\u00fcrich Nord werden bis 2024 mit einem Neubau rund 370 Wohnungen inklusive vier Kinderg\u00e4rten sowie R\u00e4ume f\u00fcr Gewerbe und Dienstleistung realisiert.<\/p>\n","protected":false},"author":2,"featured_media":29421,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12489,12485,12487,12493],"tags":[19860,19861,19862,16913],"class_list":["post-29420","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-construction","category-projects-en","category-regions-en","category-region-zurich-en","tag-4-zimmer-wohnungen-en","tag-4-5-zimmer-wohnungen-en","tag-leutschenbach-en","tag-wohnsiedlung-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"In Zurich North, around 370 apartments including four kindergartens as well as rooms for trade and services will be realized with a new building by 2024.","autor":"Text: Philipp Dreyer \/ Quelle: Stadt Z\u00fcrich\u2009\/\u2009Visualisierungen: zVg","ort":"Stadt Z\u00fcrich","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2020\/10\/wohnsiedlung-leutschenbach2-150x150.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/29420","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=29420"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/29420\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/29421"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=29420"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=29420"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=29420"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}