{"id":29649,"date":"2020-10-08T12:00:00","date_gmt":"2020-10-08T10:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/das-schulhaus-pfaffechappe-wird-zu-einem-primarschulhaus\/"},"modified":"2022-01-04T15:13:37","modified_gmt":"2022-01-04T14:13:37","slug":"das-schulhaus-pfaffechappe-wird-zu-einem-primarschulhaus","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/das-schulhaus-pfaffechappe-wird-zu-einem-primarschulhaus\/","title":{"rendered":"The \u201cPfaffechappe\u201d school house will be transformed into a primary school"},"content":{"rendered":"<p class=\"wp-block-paragraph\">A look back at the past: The &ldquo;Pfaffechappe&rdquo; school complex was built in 1973\/74 as one of the largest school buildings in the Baden elementary school. The &ldquo;Pfaffechappe&rdquo; school house is to be extensively renovated in the summer of 2021 after the secondary school has moved to the new secondary school center in Burghalde and converted into a purely primary school building.<\/p><p class=\"wp-block-paragraph\"> The architects describe the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> of the outer shell of the &ldquo;Pfaffechappe&rdquo; school complex as follows: &ldquo;The closure of the two currently covered entrance \/ break areas and<br> The relocation of the entrances to the place of the three stair towers clarifies the relationship between the school and its surroundings and creates an inviting, attractive and clear entrance area. In addition, the new entrance situation is integrated into the spatial sequence from the school building above.<br> area up to the river basin integrated. &quot;<\/p><p class=\"wp-block-paragraph\"> The work will be completed by summer 2023. At the meeting on December 11, 2018, the city of Baden wrote in a press release that the project loan for the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> and <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> of the &ldquo;Pfaffechappe&rdquo; schoolhouse was approved. The residents' council will rule on the construction loan in December 2020, and in March 2021 the people will vote on the &quot;Pfaffechappe&quot; construction loan. &#9632;<\/p>","protected":false},"excerpt":{"rendered":"<p>A look back at the past: The \u201cPfaffechappe\u201d school complex was built in 1973\/74 as one of the largest school buildings in the Baden elementary school. The \u201cPfaffechappe\u201d school house is to be extensively renovated in the summer of 2021 after the secondary school has moved to the new secondary school center in Burghalde and &#8230; <a title=\"The \u201cPfaffechappe\u201d school house will be transformed into a primary school\" class=\"read-more\" href=\"https:\/\/stage.immo-invest.ch\/en\/das-schulhaus-pfaffechappe-wird-zu-einem-primarschulhaus\/\" aria-label=\"Read more about The \u201cPfaffechappe\u201d school house will be transformed into a primary school\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":29652,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12491,12485,12490,12487],"tags":[12785,13900,20111,20112],"class_list":["post-29649","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-aargau-en","category-projects-en","category-refurbishment","category-regions-en","tag-baden-en","tag-limmattal-en","tag-pfaffechappe-en","tag-primarschulhaus-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The \u201cPfaffechappe\u201d schoolhouse will be converted into a purely primary school between summer 2021 and summer 2023.","autor":"Text: Philipp Dreyer \/ Quelle: Stadt Baden \/ Visualisierung: raumgleiter gmb","ort":"","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2020\/10\/baden_pfaffechappe-150x150.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/29649","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=29649"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/29649\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/29652"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=29649"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=29649"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=29649"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}