{"id":29970,"date":"2020-09-24T12:05:00","date_gmt":"2020-09-24T10:05:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/strabag-setzt-in-der-fahrweid-auf-3d-modelle\/"},"modified":"2022-01-11T11:27:05","modified_gmt":"2022-01-11T10:27:05","slug":"strabag-setzt-in-der-fahrweid-auf-3d-modelle","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/strabag-setzt-in-der-fahrweid-auf-3d-modelle\/","title":{"rendered":"Strabag relies on 3D models in the Fahrweid"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.geroldswil.ch\/\" target=\"_blank\" rel=\"noopener noreferrer\">Geroldswil<\/a> , <a href=\"http:\/\/www.weiningen.ch\/de\/\" target=\"_blank\" rel=\"noopener noreferrer\">Weiningen<\/a> and <a href=\"https:\/\/www.limeco.ch\/\" target=\"_blank\" rel=\"noopener noreferrer\">Limeco<\/a> are part of the owner of the joint project drainage Fahrweid. As part of the project, a new sewer system is being implemented. For the central shaft structure, the construction company <a href=\"https:\/\/www.strabag.ch\/\" target=\"_blank\" rel=\"noopener noreferrer\">Strabag<\/a> relies on Building Information Modeling (BIM), as stated in a <a href=\"https:\/\/www.strabag.ch\/databases\/internet\/_public\/content30.nsf\/web30?Openagent&amp;id=F2934000848B1148C12585E9002DB7F2&amp;men1=5&amp;sid=510\" target=\"_blank\" rel=\"noopener noreferrer\">message<\/a> . A software is used for the planning, through which, among other things, 3D models of the buildings to be realized are created.<\/p>\n<p class=\"bodytext\"> &quot;We are carrying out the central manhole structure together with the planners from ILF Switzerland using OpenBIM2Field as a pilot project,&quot; is how Stijepan Ljubicic, BIM manager at Strabag, is quoted in the message. The 3D models in particular have proven to be helpful. &ldquo;The visual representation is a big advantage. Plans in 3D are easier to understand than complicated paper plans, especially for people in the team who speak other languages &ndash; they understand the 3D model better and faster, &rdquo;says foreman Adrian Wildhaber. But changes are also easier to implement than with plans on paper, says site manager Sven Landis, &quot;in the model they are easily generated at the push of a button&quot;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Limmatstadt &#8211; Die Schlieremer Baufirma Strabag ist im Gemeinschaftsprojekt Entw\u00e4sserung Fahrweid engagiert, welches von den Gemeinden Geroldswil und Weiningen sowie Limeco durchgef\u00fchrt wird. Dabei setzt sie auf Building Information Modeling und 3D-Modelle.<\/p>\n","protected":false},"author":2,"featured_media":22620,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12476,12483],"tags":[20498,12533,12536,13580,20499,12525,13899,12528,20500],"class_list":["post-29970","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-immonews","category-proptech-en","tag-abwasser-en","tag-bau-en","tag-bauwesen-en","tag-bim-en","tag-ilf-en","tag-immoinvest-en","tag-limmatstadt-en","tag-news-en","tag-strabag-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Schlierem-based construction company Strabag is involved in the joint project drainage Fahrweid, which is carried out by the municipalities of Geroldswil and Weiningen as well as Limeco. She relies on building information modeling and 3D models.","autor":"jh","ort":"Limmatstadt","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2020\/05\/energie_9-1-150x150.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/29970","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=29970"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/29970\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/22620"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=29970"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=29970"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=29970"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}