{"id":33293,"date":"2022-02-28T16:28:48","date_gmt":"2022-02-28T15:28:48","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=33293"},"modified":"2022-02-28T16:28:49","modified_gmt":"2022-02-28T15:28:49","slug":"refurbishment-of-the-large-webermuhle-development","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/refurbishment-of-the-large-webermuhle-development\/","title":{"rendered":"Refurbishment of the large Weberm\u00fchle development"},"content":{"rendered":"<p class=\"wp-block-paragraph\">The Weberm&uuml;hle development in Neuenhof houses 368 rental apartments. The settlement on a peninsula in a loop of the Limmat was built on the industrial site of a former weaving mill and was ready to move into in 1984 after ten years of construction. Planned by the architectural office Steiger Partner AG and built by Ernst G&ouml;hner AG, the Weberm&uuml;hle with its different volumes offers living space for up to 1,500 residents. Despite the very high density, the apartments with the four rows of high-rise buildings arranged in a cross shape are characterized by a surprising foresight. Since 2008, the buildings realized in the &ldquo;G&ouml;hner 3&rdquo; modular construction system have been owned by a <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Real Estate&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Engl. f&uuml;r Immobilien&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">real estate<\/span> fund from Credit Suisse <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Asset Management&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;F&uuml;hren von Verm&ouml;genswerten. Asset Management besteht aus den Teilprozessen Portfolio Management, strategisches Fl&auml;chenmanagement, Investment-Strategie und Vermarktung\/Akquise&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Asset Management<\/span>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> <strong>Ecologically and economically sustainable <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span><\/strong><br> A good 40 years after moving in, the apartments no longer met today&rsquo;s standards &ndash; neither in terms of appearance nor in terms of comfort. With an analysis of the building structure, the client started planning an extensive partial <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> in 2009, which was implemented in stages between 2012 and 2014. Credit Suisse <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Asset Management&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;F&uuml;hren von Verm&ouml;genswerten. Asset Management besteht aus den Teilprozessen Portfolio Management, strategisches Fl&auml;chenmanagement, Investment-Strategie und Vermarktung\/Akquise&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Asset Management<\/span>&rsquo;s portfolio strategy attaches great importance to ecologically and economically sustainable solutions. With the modernization of the Weberm&uuml;hle, one wanted to make the living and green space more attractive for the tenants and to maintain the value of the property. On the other hand, the building technology should be brought up to date and thus the energy consumption should be significantly reduced. Better connections to public transport were also an important goal: Since the construction of a new inclined lift in 2015, Wettingen train station can be reached within a few minutes on foot.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"919\" height=\"480\" src=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2022\/02\/Bild_Webermuehle_b_1-919x480.jpg\" alt=\"\" class=\"wp-image-33277\" srcset=\"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2022\/02\/Bild_Webermuehle_b_1-919x480.jpg 919w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2022\/02\/Bild_Webermuehle_b_1-600x314.jpg 600w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2022\/02\/Bild_Webermuehle_b_1-662x346.jpg 662w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2022\/02\/Bild_Webermuehle_b_1-768x401.jpg 768w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2022\/02\/Bild_Webermuehle_b_1.jpg 1200w\" sizes=\"auto, (max-width: 919px) 100vw, 919px\"\/><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"> <strong>Heat supply: <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Switch&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Firma zur Registration von Domain-Namen mit den Endungen .ch und .li sowie f&uuml;r Hosting-Dienstleistungen&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">switch<\/span> to flow heat<\/strong><br> The core of the energetic <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> is the reorientation of the heat supply. To this end, the client defined a clear goal right from the start: in the future, the heat supply in the Weberm&uuml;hle should be at least 70% CO <sub>2<\/sub> -free. Due to the size of the facility, Credit Suisse <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Asset Management&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;F&uuml;hren von Verm&ouml;genswerten. Asset Management besteht aus den Teilprozessen Portfolio Management, strategisches Fl&auml;chenmanagement, Investment-Strategie und Vermarktung\/Akquise&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Asset Management<\/span> wanted to have the heating system replaced by a contractor instead of producing heat itself. The sustainability of the solution proposed by ewz with a river water heat pump convinced the client even after a detailed examination by specialists.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> <a href=\"https:\/\/www.ewz.ch\/de\/geschaeftskunden\/immobilien\/referenzen-projekte\/webermuehle.html?from=www.ewz.ch\/webportal\/weberm%c3%bchle&amp;destinationUrl=\/content\/site\/ewz\/webportal\/de\/meta\/vanity-urls\/webermuehle.html\" target=\"_blank\" rel=\"noreferrer noopener\">More about the project<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Weberm\u00fchle development in Neuenhof houses 368 rental apartments. The settlement on a peninsula in a loop of the Limmat was built on the industrial site of a former weaving mill and was ready to move into in 1984 after ten years of construction. Planned by the architectural office Steiger Partner AG and built by &#8230; <a title=\"Refurbishment of the large Weberm\u00fchle development\" class=\"read-more\" href=\"https:\/\/stage.immo-invest.ch\/en\/refurbishment-of-the-large-webermuhle-development\/\" aria-label=\"Read more about Refurbishment of the large Weberm\u00fchle development\">Read more<\/a><\/p>\n","protected":false},"author":2,"featured_media":33286,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12482,12486],"tags":[19932,23373,12520,13791,23374,13857,23375,23376,12928,23377,23378,16172,23379,23380],"class_list":["post-33293","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-energy","category-promotion","tag-credit-suisse-asset-management-en","tag-elementbausystem-en","tag-energie-en","tag-energiebedarf-en","tag-ernst-goehner-ag-en","tag-ewz-en","tag-goehner-3-en","tag-grossueberbauung-webermuehle-en","tag-modernisierung-en","tag-nachhaltig-sanieren-en","tag-neuenhof-en","tag-promo-en","tag-steiger-partner-ag-en","tag-webermuehle-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Extensive modernization has not only visually upgraded the large Weberm\u00fchle development with around 1,500 residents. Numerous energetic measures have also significantly reduced the energy requirement.","autor":"Test und Bilder: EWZ","ort":"Neuenhof","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2022\/02\/Bild_Webermuehle_b_2-336x168.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/33293","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=33293"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/33293\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/33286"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=33293"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=33293"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=33293"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}