{"id":35470,"date":"2022-04-11T16:00:00","date_gmt":"2022-04-11T14:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=35470"},"modified":"2022-04-11T15:31:35","modified_gmt":"2022-04-11T13:31:35","slug":"walo-completes-work-at-kesswil-train-station","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/walo-completes-work-at-kesswil-train-station\/","title":{"rendered":"Walo completes work at Kesswil train station"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.walo.ch\/de-ch\/home\" target=\"_blank\" rel=\"noopener\">Walo Bertschinger<\/a> completed the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> of a track section at Kesswil station in the short time available. According to a <a href=\"https:\/\/www.facebook.com\/walo.bertschinger\/\" target=\"_blank\" rel=\"noopener\">statement<\/a> on <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Facebook&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Social-Media-Plattform, auf der ein Benutzer sein pers&ouml;nliches Profil erstellt, Fotos und Videos hochl&auml;dt, Freundschaften schliesst, Notizen ver&ouml;ffentlicht u.v.m.&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Facebook<\/span> and on the company&rsquo;s dedicated<a href=\"https:\/\/www.walo.ch\/...\/news...\/fahrbahnerneuerung-kesswil\" target=\"_blank\" rel=\"noopener\">website<\/a> for this project, it has rehabilitated 595 meters of track for <a href=\"https:\/\/company.sbb.ch\/de\/home.html\" target=\"_blank\" rel=\"noopener\">SBB<\/a> in just seven days.<\/p>\n<p class=\"bodytext\"> In order to meet the time challenge, the work steps had to be precisely interlinked. The close coordination between the various <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Performance&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Wertentwicklung eines Portfolios&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">performance<\/span> centers for transport and logistics, civil engineering, track construction and road construction was carried out by Raphael Reber, construction manager for track civil engineering, according to Walo.<\/p>\n<p class=\"bodytext\"> In order not to endanger the increased volume of traffic with the replacement buses, a concept was worked out with the municipality and the SBB. A temporary bridge was used to calm the volume of traffic in the town of 1,000 inhabitants and to bring around 1,000 trucks to the construction site by a shorter route. In addition, a 600 meter long construction slope was built along the construction site.<\/p>\n<p class=\"bodytext\"> First the rails were removed and then the old ballast was excavated. This was washed and processed. Due to the washed material and the resulting shorter transport routes, Walo was able to guarantee savings of around 65 tons of CO2. A new drainage system was installed for the substructure <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span>.<\/p>\n<p class=\"bodytext\"> After the provisional approval of the SBB for the use of the washed ballast, the laying of the tracks could begin. Around 1,000 new sleepers were used for the 595 meter stretch. A <a href=\"https:\/\/www.youtube.com\/watch?v=KotSedwohww\" target=\"_blank\" rel=\"noopener\">report<\/a> of the construction work with comments from the construction management can be seen on <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;YouTube&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Social-Media-Plattform, auf der Film- und Fernsehausschnitte, Musikvideos sowie selbstgedrehte Filme ver&ouml;ffentlicht werden k&ouml;nnen&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">YouTube<\/span>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Dietikon ZH &#8211; Das Dietiker Bauunternehmen Walo Bertschinger hat seine Arbeit am Bahnhof Kesswil TG abgeschlossen. W\u00e4hrend nur sieben Tagen ist eine Gleisstrecke von 595 Metern f\u00fcr die SBB saniert worden.<\/p>\n","protected":false},"author":2,"featured_media":35461,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22358,22702,22341],"tags":[25665,12525,12526,12528,25666,14771,18112],"class_list":["post-35470","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-mobility","category-thurgau-en","tag-bahnhof-kesswil-en","tag-immoinvest-en","tag-immonews-en","tag-news-en","tag-raphael-reber-en","tag-sbb-en","tag-walo-bertschinger-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Dietiker construction company Walo Bertschinger has completed its work at the Kesswil TG train station. A track length of 595 meters was renovated for the SBB in just seven days.","autor":"gba\u00a0","ort":"Dietikon ZH ","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2022\/04\/immoinvest_Oeffentlicher_Verkehr_5-336x168.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/35470","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=35470"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/35470\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/35461"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=35470"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=35470"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=35470"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}