{"id":38951,"date":"2022-06-16T08:00:00","date_gmt":"2022-06-16T06:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=38951"},"modified":"2022-06-16T08:01:17","modified_gmt":"2022-06-16T06:01:17","slug":"zurich-airport-is-rebuilding-dock-a","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/zurich-airport-is-rebuilding-dock-a\/","title":{"rendered":"Zurich Airport is rebuilding Dock A"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.flughafen-zuerich.ch\/de\/unternehmen\" target=\"_blank\" rel=\"noopener\">Zurich Airport<\/a> has chosen the Raumfachwerk project as the winner of its competition for the construction of the new airport terminal Dock A with tower and dock root. It prevailed against ten competitors and is intended to replace the existing and aging Dock A.<\/p>\n<p class=\"bodytext\"> From 2030, according to a <a href=\"https:\/\/www.flughafen-zuerich.ch\/newsroom\/flughafen-zuerich-plant-nachhaltiges-dock-aus-holz\/\" target=\"_blank\" rel=\"noopener\">statement from<\/a> Zurich Airport, &ldquo;probably the largest airport dock to date made primarily of wood&rdquo; will be built next to the existing Dock A while operations continue. The investments are estimated at around CHF 700 million.<\/p>\n<p class=\"bodytext\"> The planning team for this project is led by the renowned architect Bjarke Ingels. In addition to his Copenhagen and New York-based architects&rsquo; office <a href=\"https:\/\/big.dk\/#about\" target=\"_blank\" rel=\"noopener\">BIG<\/a> , the largest architecture and engineering company in the USA, <a href=\"https:\/\/www.hok.com\" target=\"_blank\" rel=\"noopener\">HOK<\/a> , is also involved, as is the Zurich architects&rsquo; office <a href=\"https:\/\/www.10zu8.ch\" target=\"_blank\" rel=\"noopener\">10:8<\/a> . For example, it was responsible for the conversion of Zurich Oerlikon station. The London engineering and consulting company <a href=\"https:\/\/www.burohappold.com\" target=\"_blank\" rel=\"noopener\">Buro Happold<\/a> , which is experienced in airport construction, is also part of this team, as is the engineering office <a href=\"https:\/\/www.pirminjung.ch\" target=\"_blank\" rel=\"noopener\">Pirmin Jung<\/a> from Rain, which specializes in timber construction.<\/p>\n<p class=\"bodytext\"> According to Bjarke Ingels, the team tried to meet the complex global challenge of CO2 reduction with the simplest possible solution, a space structure made of solid wood: &ldquo;A simple but expressive design that is rooted in tradition and committed to <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Innovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Innovation in der heutigen Immobilienwelt bedeutet vor allem Digitalisierung von Prozessen. Zum Beispiel das Eliminieren von Tausenden von Excel-Bl&auml;ttern f&uuml;r Portfolio- und Asset-Manager oder das Erstellen einer Anwendung (App) f&uuml;r alle Formalit&auml;ten rund um die Beziehung zwischen Immobilieneigent&uuml;mern, - verwaltung und -mietern.&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">innovation<\/span> and the cultural and natural elements of Swiss architecture.&rdquo;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Der Flughafen Z\u00fcrich plant das Dock A durch ein Terminalgeb\u00e4ude aus Holz zu ersetzen. Den Projektwettbewerb hat ein internationales Planungsteam gewonnen, an dem auch die Z\u00fcrcher Architekten von 10:8 und das auf Holzbau spezialisierte Ingenieurb\u00fcro Pirmin Jung aus Rain LU beteiligt sind. <\/p>\n","protected":false},"author":2,"featured_media":26822,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22358,12490,22698,12493],"tags":[28701,28702,28703,28704,28705,15003,28706,12525,12526,26505,14938,12528,27750,28707,28708,13286,19934],"class_list":["post-38951","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-refurbishment","category-sustainability","category-region-zurich-en","tag-108-en","tag-big-en","tag-bjarke-ingels-en","tag-buro-happold-en","tag-dock-a-en","tag-flughafen-zuerich-en","tag-hok-en","tag-immoinvest-en","tag-immonews-en","tag-kopenhagen-en","tag-new-york-en","tag-news-en","tag-pirmin-jung-en","tag-rain-en","tag-raumfachwerk-en","tag-usa-en","tag-zuerich-oerlikon-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Zurich Airport is planning to replace Dock A with a wooden terminal building. The project competition was won by an international planning team, which also includes the Zurich architects von 10:8 and the Pirmin Jung engineering office from Rain LU, which specializes in timber construction.","autor":"mm","ort":"Kloten ZH ","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2020\/12\/reisen-150x150.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/38951","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=38951"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/38951\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/26822"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=38951"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=38951"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=38951"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}