{"id":40210,"date":"2022-06-23T09:50:34","date_gmt":"2022-06-23T07:50:34","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=40210"},"modified":"2022-06-23T09:50:38","modified_gmt":"2022-06-23T07:50:38","slug":"the-winning-project-for-the-reussbuhl-west-district-has-been-chosen","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/the-winning-project-for-the-reussbuhl-west-district-has-been-chosen\/","title":{"rendered":"The winning project for the Reussb\u00fchl West district has been chosen"},"content":{"rendered":"<p class=\"wp-block-paragraph\"><a href=\"https:\/\/officeoflivingthings.com\" target=\"_blank\" rel=\"noreferrer noopener\">Office of Living Things<\/a> and <a href=\"http:\/\/www.dudlerplanung.ch\" target=\"_blank\" rel=\"noreferrer noopener\">B&uuml;ro Dudler<\/a> for space and traffic planning.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> The 27&rsquo;000 square meters<\/p>\n\n\n<p class=\"bodytext\"> The assessment committee for the <a href=\"https:\/\/www.ckw.ch\/_Resources\/Persistent\/0c0bf6a5b8c4d67ef20761ce6da5987f8381f1d6\/07094_SB%20Reussb%C3%BChl_220610%20mit%20Anhang.pdf\" target=\"_blank\" rel=\"noopener\">study<\/a> contract for the redesign of the <a href=\"https:\/\/www.ckw.ch\" target=\"_blank\" rel=\"noopener\">CKW<\/a> site in Reussb&uuml;hl, which is now used for commercial and industrial purposes, unanimously decided in favor of the &ldquo;Habitat &ndash; <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Quartier&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Amtliches, historisches, soziales oder stadtplanerisches Stadtviertel&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Quartier<\/span> im Hain&rdquo; project. It was developed by the Zurich architects <a href=\"https:\/\/salewski-nater-kretz.ch\" target=\"_blank\" rel=\"noopener\">Salewski Nater Kretz<\/a> in collaboration with the <a href=\"https:\/\/officeoflivingthings.com\" target=\"_blank\" rel=\"noopener\">Office of Living Things<\/a> and the <a href=\"http:\/\/www.dudlerplanung.ch\" target=\"_blank\" rel=\"noopener\">Dudler office<\/a> for space and traffic planning.<\/p>\n<p class=\"bodytext\"> According to a CKW press <a href=\"https:\/\/www.ckw.ch\/ueber-ckw\/newsroom\/medienmitteilungen\/2022\/reussbuehl-west-zukunftsweisendes-projekt-mit-historischem-bezug.html\" target=\"_blank\" rel=\"noopener\">release<\/a> , the 27,000 square meter area is to be &ldquo;transformed into an attractive, lively and distinctive city quarter&rdquo;. The energy service provider will give up its location there &ldquo;in a few years&rdquo;. In the call for tenders, requirements were made with regard to heat generation and rainwater management. In addition, at least half of the CKW shed hall, a former silk mill, was to be retained. Residential buildings will primarily be built on the remaining area.<\/p>\n<p class=\"bodytext\"> The winning project &ldquo;convinces in the reinterpretation and further development of the historical landscape&rdquo;, which was once characterized by floodplains and water-using industry. The design based on the so-called sponge city principle &ldquo;cleverly&rdquo; incorporates these historical references. This project will be further developed in the coming months and will then form the basis for the Reussb&uuml;hl West development plan. The designs of all planning teams are on display at CKW in Rathausen from June 21st to July 4th.<\/p>","protected":false},"excerpt":{"rendered":"<p>Das Projekt \u201eHabitat \u2013 Quartier im Hain\u201c hat den Studienauftrag f\u00fcr das Luzerner Quartier Reussb\u00fchl West gewonnen. Wenn Energiedienstleister CKW seinen dortigen Standort aufgibt, soll auf dem 27&#8217;000 Quadratmeter grossen Areal ein lebendiges Stadtviertel entstehen. <\/p>\n","protected":false},"author":2,"featured_media":40205,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12496,12489],"tags":[13516,12533,12535,12536,29247,12941,29248,12525,12526,12591,29249,12528,29250,13695,12599,29251,29252,14480,15125],"class_list":["post-40210","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-region-luzern-en","category-new-construction","tag-areal-en","tag-bau-en","tag-bauen-en","tag-bauwesen-en","tag-buero-dudler-en","tag-ckw-en","tag-habitat-quartier-im-hain-en","tag-immoinvest-en","tag-immonews-en","tag-neubau-en","tag-neugestaltung-en","tag-news-en","tag-office-of-living-things-en","tag-projekt-en","tag-raumplanung-en","tag-reussbuehl-west-en","tag-salewski-nater-kretz-en","tag-siegerprojekt-en","tag-verkehrsplanung-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The \u201cHabitat \u2013 Quartier im Hain\u201d project has won the study contract for the Reussb\u00fchl West district in Lucerne. When energy service provider CKW gives up its location there, a lively district is to be created on the 27,000 square meter site.","autor":"mm","ort":"Luzern","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2022\/06\/immoinvest_Reussbuehl_West-336x168.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/40210","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=40210"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/40210\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/40205"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=40210"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=40210"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=40210"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}