{"id":51245,"date":"2023-03-22T16:00:00","date_gmt":"2023-03-22T15:00:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=51245"},"modified":"2023-03-22T09:19:09","modified_gmt":"2023-03-22T08:19:09","slug":"energie-360-begins-renovation-of-its-headquarters","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/energie-360-begins-renovation-of-its-headquarters\/","title":{"rendered":"Energie 360\u00b0 begins renovation of its headquarters"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.energie360.ch\/de\/unternehmen\/\" target=\"_blank\" rel=\"noopener\">Energie 360&deg;<\/a> can begin the conversion of its headquarters in Zurich Altstetten. The energy provider, which is majority-owned by the city of Zurich, is investing almost 28 million Swiss francs in the redesign and expansion of its offices into an open office landscape, the construction of a large-scale photovoltaic system and the optimisation of the building services, according to a <a href=\"https:\/\/www.energie360.ch\/de\/energie-360\/medieninformationen\/medienmitteilungen\/baubeginn-am-hauptsitz-von-energie-360\/\" target=\"_blank\" rel=\"noopener\">media release<\/a>.<\/p>\n<p class=\"bodytext\">According to the release, Energie 360&deg; received the building permit in January. The construction site can now be set up from the end of March. The <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Renovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Massnahmen zur Behebung von M&auml;ngeln, die durch Abnutzung oder Witterungseinfl&uuml;sse entstanden sind; Wiederherstellung des urspr&uuml;nglichen Zustands eines Geb&auml;udes oder von Teilen davon&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">renovation<\/span> work should be completed by late autumn 2024. In the meantime, the employees will move their workplaces to a temporary headquarters in Zurich Altstetten.<\/p>\n<p class=\"bodytext\">The building is already fully supplied with renewable energy and is energy-optimised. In the course of the conversion, it will receive additional solar panels designed by Jessenvollenweider <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Architektur&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Entwurf und Gestaltung von Bauwerken unter Ber&uuml;cksichtigung &auml;sthetischer, technischer, sozialer, wirtschaftlicher und &ouml;kologischer Belange. Im Unterschied zum &laquo;blossen&raquo; Bauen bem&uuml;ht sich Architektur um die Koordination vielf&auml;ltiger Werte, Anspr&uuml;che und Erfahrungen&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Architektur<\/span> from Basel. The office is reportedly a pioneer in the field of photovoltaic systems. In future, the modules will produce around half of Energie 360&deg;&rsquo;s electricity requirements.<\/p>\n<p class=\"bodytext\">&ldquo;The additional photovoltaic systems on the fa&ccedil;ade and the extension on the roof turn the headquarters into a green power plant with an exemplary function and a strong external impact,&rdquo; J&ouml;rg Wild, CEO of Energie 360&deg;, is quoted as saying in the media release.<\/p>\n<p class=\"bodytext\">The company wants to offer its customers exclusively renewable energy by 2040. As a sustainable energy and mobility service provider, it therefore also has its own energy consumption in mind.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The energy provider Energie 360\u00b0 will start renovating its headquarters in Altstetten at the end of March. In addition to a redesign of the offices, the building will receive additional photovoltaic systems. With this, the company intends to cover about half of its annual electricity needs itself in the future.<\/p>\n","protected":false},"author":2,"featured_media":42675,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12476],"tags":[14087,12521,15082,12564,12525,12526,12528,22977,14268,37215],"class_list":["post-51245","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-immonews","tag-energieversorgung-en","tag-erneuerbareenergien-en","tag-hauptsitz-en","tag-immobilien-en","tag-immoinvest-en","tag-immonews-en","tag-news-en","tag-photovoltaikanlage-en","tag-renovierung-en","tag-umgestaltung-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The energy provider Energie 360\u00b0 will start renovating its headquarters in Altstetten at the end of March. In addition to a redesign of the offices, the building will receive additional photovoltaic systems. With this, the company intends to cover about half of its annual electricity needs itself in the future.","autor":"ko","ort":"Z\u00fcrich","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2022\/08\/banner-smart-construction2-336x168.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/51245","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=51245"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/51245\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/42675"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=51245"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=51245"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=51245"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}