{"id":56613,"date":"2023-05-30T15:35:32","date_gmt":"2023-05-30T13:35:32","guid":{"rendered":"https:\/\/www.immo-invest.ch\/implenia-gewinnt-in-deutschland-und-der-schweiz-hochbauauftraege-im-gesamtwert-von-mehr-als-chf-170-mio\/"},"modified":"2023-05-31T10:10:38","modified_gmt":"2023-05-31T08:10:38","slug":"implenia-gewinnt-in-deutschland-und-der-schweiz-hochbauauftraege-im-gesamtwert-von-mehr-als-chf-170-mio","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/implenia-gewinnt-in-deutschland-und-der-schweiz-hochbauauftraege-im-gesamtwert-von-mehr-als-chf-170-mio\/","title":{"rendered":"Implenia wins building construction contracts worth more than CHF 170 million in Germany and Switzerland"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Implenia has been commissioned by the Bavarian State Ministry of Science and the Arts to act as total contractor for the planning and construction of a new rehearsal and workshop centre (PWZ) for the Bavarian State Theatre in Munich, ready for operation. After the Regensburg Initial Reception Centre and the Regensburg State Housing Estate, this is already the third project Implenia has realised as a total contractor for the Free State of Bavaria as client, represented by the Regensburg State Building Authority. Planning began in March and construction is due to start in June. Handover to the client is scheduled for December 2026. The order volume for Implenia is more than EUR 140 million.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The agreed services include the planning and construction of the PWZ, from the excavation pit for the 93-metre-long and 86-metre-wide L-shaped building to the interior design, including building services, materials handling technology and stage technology for three rehearsal stages, as well as workshop equipment and canteen facilities. The contract also includes the design of the outdoor facilities, including a depot with access zones, delivery and parking areas for lorries and containers, an underground car park and the landscaped outdoor area. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The technically demanding project includes the creation of large, freely spanned spaces for the rehearsal stages, which, as a steel composite construction, are reminiscent of bridge construction. An acoustically highly effective building partition will protect the rehearsal wing from noise and vibrations from the workshop wing. Other special soundproofing devices will allow the rehearsal stages to be used in parallel. Implenia was able to win the best planners for the special trades of stage technology and workshop technology. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Partnership and integrated approach impressed even at the bidding stage <\/strong><br>Implenia impressed even at the bidding stage with its partnership approach and a team of highly qualified internal and external specialists who offered solutions to the complex technical requirements of the project. In the implementation phase, Implenia will manage the team and, together with its own specialist planners, realise the input and implementation planning as well as the new building ready for operation. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As an integrated construction and <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Real Estate&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Engl. f&uuml;r Immobilien&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">real estate<\/span> service provider, Implenia will provide a large proportion of the services itself across all divisions: The foundation engineering division is responsible for the excavation pit. For the shell construction, specialist knowledge from the civil engineering division will be called upon. BCL Building Construction Logistics, a member of the Implenia Group, is responsible for the smooth, safe and sustainable organisation of the construction site. The Fa&ccedil;ade Technology division is contributing its expertise to the construction of the building envelope made of dark grey corrugated fibre panels, prefabricated concrete elements and aluminium window elements with external venetian blinds. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Digitalisation and tools to increase efficiency <\/strong><br>A BIM model was set up for the new building, on which all planners are working. This means that the planning status is transparent at all times and can be flexibly adapted. The BIM model is also used in the execution, for example to coordinate the various trades. In addition, it is planned to use the model for construction process simulations, for quantity takeoff and for tendering the finishing trades. Lean construction methods and tools are used to optimise construction processes, to control material flows and to precisely coordinate the trades. This enables a continuous and even construction process. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>High sustainability requirements <\/strong><br><strong>Sustainable <\/strong> new construction and operation are important to both the client and Implenia. Accordingly, the building is being constructed in accordance with the Building Energy Act (GEG &sect; 10), all materials comply with the &ldquo;low-pollutant construction&rdquo; requirements catalogue (QN 3) of the Bavarian State Construction Directorate, and the technical systems are designed for sustainable and environmentally friendly operation. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Besenrainstrasse and Katzenbachstrasse Zurich &ndash; sustainable replacement housing <\/strong><br>In Switzerland, Implenia was commissioned by client Swiss Life <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Asset Management&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;F&uuml;hren von Verm&ouml;genswerten. Asset Management besteht aus den Teilprozessen Portfolio Management, strategisches Fl&auml;chenmanagement, Investment-Strategie und Vermarktung\/Akquise&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Asset Management<\/span> AG as general contractor for the replacement housing &ldquo;Besenrainstrasse\/Morgentalstrasse&rdquo; in Zurich Wollishofen. This is a project with 36 rental flats and 22 underground parking spaces, which will be built using the solid construction method. Construction work started in March with a pollutant clean-up, and handover is scheduled for the end of November 2024. <span class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;SNBS&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Standard nachhaltiges Bauen Schweiz; Ziel des Standards ist es, die drei Dimensionen des nachhaltigen Bauens (Gesellschaft, Wirtschaft, Umwelt) m&ouml;glichst umfassend in Planung, Bau und Betrieb mit einzubeziehen&lt;\/div&gt;\"  data-mobile-support=\"0\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex='0' role='link'>SNBS<\/span> Platinum certification is being sought for the new building. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Implenia was also awarded a contract by the SBB pension fund for a replacement building on Katzenbachstrasse in Zurich-Seebach. Implenia will also be the general contractor for this project. The new building will have 30 high-quality rental flats with a ventilated wooden fa&ccedil;ade on three floors and 18 underground parking spaces. Construction work has already started in February with a pollutant clean-up carried out by the master builder&rsquo;s division. Completion is scheduled for February 2025. The flats will be built to the <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Minergie&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Baustandard und Label, das als Zertifikat f&uuml;r Geb&auml;ude ausgegeben wird, die neu erstellt oder saniert einen entsprechenden Energienachweis erf&uuml;llen. Standards: Minergie, Minergie-P, Minergie-A. Im Zentrum steht der Wohn- und Arbeitskomfort, der durch eine hochwertige energiefeffiziente Geb&auml;udeh&uuml;lle und systematische Lufterneuerung erreicht wird. Das Ziel wird als Grenzwert im Energieverbrauch definiert&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">Minergie<\/span> ECO standard. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Through these two contracts, Implenia is further contributing to the sustainable renewal of Switzerland&rsquo;s <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Real Estate&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Engl. f&uuml;r Immobilien&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">real estate<\/span> stock with its comprehensive expertise. The total value of both contracts is over CHF 30 million. <\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"853\" height=\"480\" src=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Probebuehne-853x480.jpg\" alt=\"\" class=\"wp-image-56515\" srcset=\"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Probebuehne-853x480.jpg 853w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Probebuehne-scaled-600x338.jpg 600w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Probebuehne-615x346.jpg 615w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Probebuehne-768x432.jpg 768w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Probebuehne-1536x864.jpg 1536w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Probebuehne-2048x1152.jpg 2048w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Probebuehne-640x360.jpg 640w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Probebuehne-854x480.jpg 854w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Probebuehne-1104x621.jpg 1104w\" sizes=\"auto, (max-width: 853px) 100vw, 853px\"\/><figcaption>The three rehearsal stages for the houses of the Bavarian State Theatre and the workshops will go into operation at the end of 2026 (<span class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Image&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Individuelles Vorstellungsbild, das Dritte von einer Marke, einem Produkt oder einer Unternehmung haben. Aus Marketingsicht wird zwischen einem gegenw&auml;rtigen (Ist-Image) und einem anzustrebenden Image (Soll-Image) unterschieden&lt;\/div&gt;\"  data-mobile-support=\"0\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex='0' role='link'>Image<\/span>: &copy; D&ouml;mges Architekten AG, Regensburg).<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"720\" height=\"480\" src=\"https:\/\/www.immo-invest.ch\/wp-content\/uploads\/2023\/05\/Ersatzneubau_Katzenbachstrasse-720x480.jpg\" alt=\"\" class=\"wp-image-56511\" srcset=\"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/Ersatzneubau_Katzenbachstrasse-720x480.jpg 720w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/Ersatzneubau_Katzenbachstrasse-scaled-600x400.jpg 600w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/Ersatzneubau_Katzenbachstrasse-519x346.jpg 519w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/Ersatzneubau_Katzenbachstrasse-768x512.jpg 768w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/Ersatzneubau_Katzenbachstrasse-1536x1024.jpg 1536w, https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/Ersatzneubau_Katzenbachstrasse-2048x1365.jpg 2048w\" sizes=\"auto, (max-width: 720px) 100vw, 720px\"\/><figcaption>New replacement residential quarter Katzenbach with 30 flats in Zurich-Seebach (<span class=\"glossaryLink\"  aria-describedby=\"tt\"  data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Image&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Individuelles Vorstellungsbild, das Dritte von einer Marke, einem Produkt oder einer Unternehmung haben. Aus Marketingsicht wird zwischen einem gegenw&auml;rtigen (Ist-Image) und einem anzustrebenden Image (Soll-Image) unterschieden&lt;\/div&gt;\"  data-mobile-support=\"0\"  data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex='0' role='link'>Image<\/span>: &copy; Think Architecture AG).<\/figcaption><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Media contact:<\/strong><br>Corporate Communications, T +41 58 474 74 77, <a href=\"mailto:communication@implenia.com\">communication@implenia.com<\/a><br><br><strong>Investor and analyst contact:<\/strong><br>Investor Relations, T +41 58 474 35 04, <a href=\"mailto:ir@implenia.com\">ir@implenia.com<\/a><br><br><strong>Investor agenda:<\/strong><br>16 August 2023: Half-year results 2023, analyst and media conference<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Total contractor contract for planning and new construction of the rehearsal and workshop centre of the Bavarian State Theatre in Munich | Partnership-based project management with integrated range of services | Two new replacement buildings for apartment blocks | Focus on sustainability | Contract volume totalling over CHF 170 million.<\/p>\n","protected":false},"author":2,"featured_media":56520,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12489],"tags":[39309,12955,12591,39310,38586,39311],"class_list":["post-56613","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-new-construction","tag-bayerischen-staatsschauspiel-muenchen-en","tag-implenia-en","tag-neubau-en","tag-probezentrum-en","tag-projektabwicklung-en","tag-werkstaettezentrum-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Total contractor contract for planning and new construction of the rehearsal and workshop centre of the Bavarian State Theatre in Munich | Partnership-based project management with integrated range of services | Two new replacement buildings for apartment blocks | Focus on sustainability | Contract volume totalling over CHF 170 million.","autor":"Quelle: implenia.com","ort":"Glattpark (Opfikon)","bildunterschrift":"Anspruchsvoller und komplexer Neubau f\u00fcr das Bayerische Staatsschauspiel M\u00fcnchen:\r\nDas neue Proben- und Werkst\u00e4ttenzentrum im M\u00fcnchner Osten (Bild: \u00a9 D\u00f6mges Architekten AG,\r\nRegensburg).","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/05\/PWZ_Aussenansicht-336x168.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/56613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=56613"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/56613\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/56520"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=56613"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=56613"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=56613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}