{"id":61032,"date":"2023-08-03T11:40:00","date_gmt":"2023-08-03T09:40:00","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=61032"},"modified":"2023-08-03T11:33:06","modified_gmt":"2023-08-03T09:33:06","slug":"leitfaden-soll-planungssicherheit-fuer-solarfassaden-schaffen","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/leitfaden-soll-planungssicherheit-fuer-solarfassaden-schaffen\/","title":{"rendered":"Guideline to create planning security for solar fa\u00e7ades"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.swissolar.ch\/de\" target=\"_blank\" rel=\"noopener\">Swissolar<\/a> wants to create planning security for photovoltaic (PV) installations on fa&ccedil;ades for planning offices and building owners. Media reports in May had created a distorted picture regarding the corresponding approval practice, writes the association of the Swiss solar energy industry in a <a href=\"https:\/\/www.swissolar.ch\/de\/news\/detail\/photovoltaik-fassaden-swissolar-und-brandschutzbehoerden-sorgen-fuer-planungssicherheit-47198\" target=\"_blank\" rel=\"noopener\">statement<\/a>. In joint discussions, Swissolar, fire protection authorities, planning offices and building owners have straightened out this picture and worked out a joint procedure, it continues.<\/p>\n<p class=\"bodytext\">In consultation with the <a href=\"https:\/\/www.bsvonline.ch\/de\/\" target=\"_blank\" rel=\"noopener\">Association of Cantonal Fire Insurers<\/a>, Swissolar will then publish a guideline for the planning of solar installations on fa&ccedil;ades. It is intended to serve as an interim solution until a state of the art paper (STP) is available, according to the statement. Swissolar intends to develop such a STP by autumn 2024 together with experts in photovoltaics and fire protection.<\/p>\n<p class=\"bodytext\">&ldquo;According to fire protection legislation, a verification procedure will still be necessary for the approval of PV fa&ccedil;ades,&rdquo; Swissolar explains. The guideline here indicates the cases in which fire tests on the fa&ccedil;ades can be dispensed with. For the development of the final STP, fire tests are to be made in accredited laboratories abroad. &ldquo;This procedure, which has been coordinated throughout Switzerland, ensures planning security for affected planners and building owners, while at the same time ensuring safety in buildings and personal protection,&rdquo; writes Swissolar.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>In consultation with the Association of Cantonal Fire Insurers, Swissolar wants to create planning security for solar fa\u00e7ades. To this end, the Swiss Solar Energy Association will develop a guideline together with experts in photovoltaics and fire protection.<\/p>\n","protected":false},"author":2,"featured_media":61025,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12476],"tags":[40684,12521,12526,40293,12528,12529,15586,13340,12530],"class_list":["post-61032","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-immonews","tag-brandschutz-en","tag-erneuerbareenergien-en","tag-immonews-en","tag-leitfaden-en","tag-news-en","tag-photovoltaik-en","tag-planung-en","tag-sicherheit-en","tag-solar-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"In consultation with the Association of Cantonal Fire Insurers, Swissolar wants to create planning security for solar fa\u00e7ades. To this end, the Swiss Solar Energy Association will develop a guideline together with experts in photovoltaics and fire protection.","autor":"ce\/hs","ort":"Z\u00fcrich ","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/08\/Solar_2-336x168.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/61032","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=61032"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/61032\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/61025"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=61032"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=61032"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=61032"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}