{"id":66153,"date":"2023-10-20T09:34:52","date_gmt":"2023-10-20T07:34:52","guid":{"rendered":"https:\/\/www.immo-invest.ch\/partner-testen-innovationen-fuer-bausektor-in-neuer-nest-unit\/"},"modified":"2023-10-20T12:30:36","modified_gmt":"2023-10-20T10:30:36","slug":"partner-testen-innovationen-fuer-bausektor-in-neuer-nest-unit","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/partner-testen-innovationen-fuer-bausektor-in-neuer-nest-unit\/","title":{"rendered":"Partners test innovations for construction sector in new NEST unit"},"content":{"rendered":"<p class=\"bodytext\">After three years of planning, construction is underway again at NEST. The new modular building part (unit) is called <a href=\"https:\/\/www.empa.ch\/web\/nest\/step2\" target=\"_blank\" rel=\"noopener\">STEP2<\/a>. As in all other modules of the research and <span class=\"glossaryLink\" aria-describedby=\"tt\" data-cmtooltip=\"&lt;div class=glossaryItemTitle&gt;Innovation&lt;\/div&gt;&lt;div class=glossaryItemBody&gt;Innovation in der heutigen Immobilienwelt bedeutet vor allem Digitalisierung von Prozessen. Zum Beispiel das Eliminieren von Tausenden von Excel-Bl&auml;ttern f&uuml;r Portfolio- und Asset-Manager oder das Erstellen einer Anwendung (App) f&uuml;r alle Formalit&auml;ten rund um die Beziehung zwischen Immobilieneigent&uuml;mern, - verwaltung und -mietern.&lt;\/div&gt;\" data-mobile-support=\"0\" data-gt-translate-attributes='[{\"attribute\":\"data-cmtooltip\", \"format\":\"html\"}]' tabindex=\"0\" role=\"link\">innovation<\/span> building of the two research institutes, the Swiss Federal Laboratories for Materials Testing and Research (<a href=\"http:\/\/www.empa.ch\/\" target=\"_blank\" rel=\"noopener\">Empa<\/a>) and the Water Research Institute of the ETH Domain<a href=\"http:\/\/www.eawag.ch\/\" target=\"_blank\" rel=\"noopener\">(Eawag<\/a>), the project partners are also testing innovations with high market potential there. STEP2 is scheduled for completion in spring 2024.<\/p>\n<p class=\"bodytext\">As STEP2&rsquo;s main partner, <a href=\"https:\/\/www.basf.com\/ch\/de.html\" target=\"_blank\" rel=\"noopener\">BASF<\/a> is making a significant contribution to the success of the project with its expertise, network and sustainable materials, according to a <a href=\"https:\/\/www.empa.ch\/web\/s604\/step2-baustart\" target=\"_blank\" rel=\"noopener\">media release<\/a>. After completion, all units will also be used as offices or flats.<\/p>\n<p class=\"bodytext\">On the first floor of the two-storey unit, a noise-insulating <a href=\"https:\/\/www.empa.ch\/web\/nest\/step2#Decke\" target=\"_blank\" rel=\"noopener\">ribbed filigree ceiling<\/a> for office and high-rise buildings was installed. The 3D-printed formwork is 100 per cent recyclable. The circular concrete further increased sustainability. The <a href=\"https:\/\/www.empa.ch\/web\/nest\/step2#Treppe\" target=\"_blank\" rel=\"noopener\">Cadenza concrete staircase<\/a>, also made with computer-aided design and 3D printing, leads to the second floor.<\/p>\n<p class=\"bodytext\">STEP2 also addresses the <a href=\"https:\/\/www.empa.ch\/web\/nest\/step2#Geb%C3%A4udeh%C3%BClle\" target=\"_blank\" rel=\"noopener\">building envelope<\/a> and its potential for energy optimisation. The building fa&ccedil;ade is designed in such a way that various fixtures can be tested with minimal effort. In addition, a comprehensive <a href=\"https:\/\/www.empa.ch\/web\/nest\/step2#Energiekonzept\" target=\"_blank\" rel=\"noopener\">energy and comfort concept<\/a> including innovative <a href=\"https:\/\/www.empa.ch\/web\/nest\/step2#Licht\" target=\"_blank\" rel=\"noopener\">lighting design<\/a> was developed.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Das NEST, das modulare Forschungs- und Innovationsgeb\u00e4ude von Eidgen\u00f6ssischer Materialpr\u00fcfungs- und Forschungsanstalt und Eawag, erh\u00e4lt eine neue Einheit namens STEP2. Dort werden marktf\u00e4hige Innovationen im Bausektor verbaut.<\/p>\n","protected":false},"author":2,"featured_media":66148,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22697,22358,12476,12493],"tags":[12536,12525,12526,14370,12528],"class_list":["post-66153","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-company","category-construction","category-immonews","category-region-zurich-en","tag-bauwesen-en","tag-immoinvest-en","tag-immonews-en","tag-nest-en","tag-news-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"D\u00fcbendorf ZH - Das NEST, das modulare Forschungs- und Innovationsgeb\u00e4ude von Eidgen\u00f6ssischer Materialpr\u00fcfungs- und Forschungsanstalt und Eawag, erh\u00e4lt eine neue Einheit namens STEP2. Dort werden marktf\u00e4hige Innovationen im Bausektor verbaut.","autor":"ce\/mm","ort":"D\u00fcbendorf ZH","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/10\/construction-site-285645_1280-336x168.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/66153","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=66153"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/66153\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/66148"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=66153"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=66153"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=66153"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}