{"id":93223,"date":"2024-05-17T08:47:24","date_gmt":"2024-05-17T06:47:24","guid":{"rendered":"https:\/\/www.immo-invest.ch\/produktion-von-biogas-stoesst-im-laufental-thierstein-auf-interesse\/"},"modified":"2024-06-07T13:32:14","modified_gmt":"2024-06-07T11:32:14","slug":"produktion-von-biogas-stoesst-im-laufental-thierstein-auf-interesse","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/produktion-von-biogas-stoesst-im-laufental-thierstein-auf-interesse\/","title":{"rendered":"Biogas production attracts interest in Laufental-Thierstein"},"content":{"rendered":"<p class=\"bodytext\">Erdgas AG Laufenstein-Thierstein<a href=\"https:\/\/www.primeo-energie.ch\/en\/profibereich\/region-basel\/profi-basel-erdgas.html\" target=\"_blank\" rel=\"noopener\">(GASAG<\/a>), based in M&uuml;nchenstein, is clarifying where a biogas plant can be built in the region and how it can be financed. The plant would have to be located near a gas pipeline, for example at the M&uuml;sch gas station in Laufen, it writes in a <a href=\"https:\/\/www.boha.ch\/wp-content\/uploads\/2024\/04\/Brief-an-Landwirte-2024_04_18.pdf\" target=\"_blank\" rel=\"noopener\">letter<\/a> to farmers in the region. For building law reasons, farmers would have to own the biogas and processing plant. GASAG would guarantee the purchase of the biogas.<\/p>\n<p class=\"bodytext\">The regional gas supplier based in M&uuml;nchenstein has had a potential survey carried out in recent months. According to a <a href=\"https:\/\/www.boha.ch\/wp-content\/uploads\/2024\/05\/Medienmitteilung-Produktion-von-Biogas-im-Laufental-Thierstein_07.05.2024.pdf\" target=\"_blank\" rel=\"noopener\">press release<\/a>, <a href=\"https:\/\/www.boha.ch\" target=\"_blank\" rel=\"noopener\">BOHA AG<\/a>, which it commissioned, asked 38 farmers in the region whether they would be prepared to supply slurry and manure and accept the residual materials. 23 farmers with a maximum total of 2000 livestock units declared their willingness to participate. This corresponds to a potential of 7 to 8 gigawatt hours. This could cover 20 per cent of GASAG&rsquo;s consumption.<\/p>\n<p class=\"bodytext\">Founded in 1993, GASAG is owned by <a href=\"https:\/\/www.primeo-energie.ch\" target=\"_blank\" rel=\"noopener\">Primeo W&auml;rmeholding AG<\/a>, the municipalities of Breitenbach, B&uuml;sserach, Dittingen, Meltingen and Zwingen and the town of Laufen. The business is managed by Primeo Energie.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Erdgas AG Laufenstein-Thierstein (GASAG) is planning to build a biogas plant in the M\u00fcnchenstein region. In a letter to farmers, the location issue was clarified and financing options were examined. The plant is to be located near a gas pipeline and operated by farmers, while GASAG guarantees the purchase of the biogas. A potential assessment revealed a possible biogas volume of 7 to 8 gigawatt hours, which could cover 20 percent of GASAG&#8217;s consumption.<\/p>\n","protected":false},"author":2,"featured_media":93218,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[12494,12476,12485,22698],"tags":[15296,46685,12525,12526,46686,12528],"class_list":["post-93223","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-region-basel-en","category-immonews","category-projects-en","category-sustainability","tag-biogasanlage-en","tag-gasversorgung-en","tag-immoinvest-en","tag-immonews-en","tag-landwirte-en","tag-news-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Erdgas AG Laufenstein-Thierstein (GASAG) is planning to build a biogas plant in the M\u00fcnchenstein region. In a letter to farmers, the location issue was clarified and financing options were examined. The plant is to be located near a gas pipeline and operated by farmers, while GASAG guarantees the purchase of the biogas. A potential assessment revealed a possible biogas volume of 7 to 8 gigawatt hours, which could cover 20 percent of GASAG's consumption.","autor":"ce\/stk","ort":"M\u00fcnchenstein BL","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2024\/05\/Unbenannt-25-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/93223","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=93223"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/93223\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/93218"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=93223"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=93223"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=93223"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}