{"id":96206,"date":"2024-06-06T12:04:43","date_gmt":"2024-06-06T10:04:43","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=96206"},"modified":"2024-06-06T09:09:04","modified_gmt":"2024-06-06T07:09:04","slug":"einweihung-einer-photovoltaikanlage-bei-limeco","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/en\/einweihung-einer-photovoltaikanlage-bei-limeco\/","title":{"rendered":"Inauguration of a photovoltaic system at Limeco"},"content":{"rendered":"<p class=\"bodytext\">According to a <a href=\"http:\/\/www.limeco.ch\/news\/photovoltaikanlage\" target=\"_blank\" rel=\"noopener\">press release<\/a>, the Limmattaler Regiowerk <a href=\"http:\/\/www.limeco.ch\" target=\"_blank\" rel=\"noopener\">Limeco<\/a>, based in Dietikon, has inaugurated a photovoltaic system on the roof of the wastewater treatment plant<a href=\"http:\/\/www.vsa.ch\/glossar\/ara\" target=\"_blank\" rel=\"noopener\">(ARA<\/a>). According to the company, 624 solar panels with a capacity of 265.2 kilowatts peak generate as much solar power as 70 households with an annual consumption of 3,600 kilowatt hours.<\/p>\n<p class=\"bodytext\">On an area of 1220 square metres, 252,000 kilowatt hours of green electricity are to be produced, primarily for the ARA&rsquo;s own requirements and the waste recycling plant. Any surplus energy will be fed into the public grid and made available to the general public.<\/p>\n<p class=\"bodytext\">The aim is to promote the expansion of renewable energy supply. Limeco plans to convert the supply of the entire Limmat Valley to CO2-neutral energy sources by 2050.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Limmattal regional utility Limeco has inaugurated a photovoltaic system with 624 solar panels on the roof of the wastewater treatment plant. This generates 252,000 kilowatt-hours of green electricity, primarily for the plant&#8217;s own use and surpluses for the public grid.<\/p>\n","protected":false},"author":2,"featured_media":96199,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22358,12482,12476,22698,12493],"tags":[13822,12525,12526,15666,12528,22977],"class_list":["post-96206","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-construction","category-energy","category-immonews","category-sustainability","category-region-zurich-en","tag-erneuerbare-energie-en","tag-immoinvest-en","tag-immonews-en","tag-limeco-en","tag-news-en","tag-photovoltaikanlage-en"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"The Limmattal regional utility Limeco has inaugurated a photovoltaic system with 624 solar panels on the roof of the wastewater treatment plant. This generates 252,000 kilowatt-hours of green electricity, primarily for the plant's own use and surpluses for the public grid.","autor":"ce\/heg","ort":"Dietikon ZH","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2024\/06\/Unbenannt-6-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/96206","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/comments?post=96206"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/posts\/96206\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media\/96199"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/media?parent=96206"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/categories?post=96206"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/en\/wp-json\/wp\/v2\/tags?post=96206"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}