{"id":117472,"date":"2024-10-17T17:49:06","date_gmt":"2024-10-17T15:49:06","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=117472"},"modified":"2024-10-17T10:31:35","modified_gmt":"2024-10-17T08:31:35","slug":"rueckbau-des-hasler-areals-in-dietikon","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/fr\/rueckbau-des-hasler-areals-in-dietikon\/","title":{"rendered":"D\u00e9construction du site Hasler \u00e0 Dietikon"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/www.limeco.ch\/\" target=\"_blank\" rel=\"noopener\">Limeco<\/a> fait d&eacute;construire le site Hasler &agrave; Dietikon. Entre octobre 2024 et avril 2025, les serres et les hangars de l&rsquo;ancienne jardinerie Hasler Pflanzen seront d&eacute;molis et les sols pollu&eacute;s enlev&eacute;s, informe Limmattaler Regiowerk dans un <a href=\"https:\/\/www.limeco.ch\/medienmitteilung\/rueckbau-hasler-areal\/\" target=\"_blank\" rel=\"noopener\">communiqu&eacute;<\/a>. Limeco avait acquis le terrain l&rsquo;ann&eacute;e derni&egrave;re en tant que r&eacute;serve fonci&egrave;re pour le projet g&eacute;n&eacute;rationnel de centre &eacute;nerg&eacute;tique de Limmattal.<\/p>\n<p class=\"bodytext\">Regiowerk est tenu de reconstruire son usine de traitement des ordures m&eacute;nag&egrave;res et d&rsquo;agrandir sa station d&rsquo;&eacute;puration des eaux us&eacute;es (STEP) d&rsquo;ici 2034. Le centre &eacute;nerg&eacute;tique de Limmattal doit voir le jour &agrave; cette occasion. Les travaux n&eacute;cessaires doivent &ecirc;tre r&eacute;alis&eacute;s par &eacute;tapes et contribuer autant que possible &agrave; la transition &eacute;nerg&eacute;tique et climatique de la vall&eacute;e de la Limmat.<\/p>\n<p class=\"bodytext\">Pour la mise en &oelig;uvre de ce projet interg&eacute;n&eacute;rationnel, Limeco a d&eacute;j&agrave; acquis en 2018 le site de Coop &agrave; Dietikon. Le site Hasler doit servir de lieu de montage et d&rsquo;installation pendant la phase de construction. Sinon, Limeco veut le proposer &agrave; des tiers en location ou l&rsquo;utiliser pour un &eacute;change de terrain contre des surfaces plus appropri&eacute;es.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Limeco fait d\u00e9construire le site Hasler \u00e0 Dietikon pour faire de la place \u00e0 son projet g\u00e9n\u00e9rationnel de centre \u00e9nerg\u00e9tique de la vall\u00e9e de la Limmat. Entre octobre 2024 et avril 2025, les anciens b\u00e2timents seront d\u00e9molis et les sols r\u00e9habilit\u00e9s.<\/p>\n","protected":false},"author":2,"featured_media":117467,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[743,22357,8452,4957],"tags":[977,872,3931,50027,2002,21139],"class_list":["post-117472","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-immonews-fr","category-industrie-du-batiment","category-regions","category-region-zurich","tag-dietikon-fr","tag-immoinvest-fr","tag-immonews-fr","tag-limmattaler-energiezentrum-fr","tag-news-fr","tag-rueckbau-fr"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Limeco fait d\u00e9construire le site Hasler \u00e0 Dietikon pour faire de la place \u00e0 son projet g\u00e9n\u00e9rationnel de centre \u00e9nerg\u00e9tique de la vall\u00e9e de la Limmat. Entre octobre 2024 et avril 2025, les anciens b\u00e2timents seront d\u00e9molis et les sols r\u00e9habilit\u00e9s.","autor":"ce\/hs","ort":"Dietikon ZH","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2024\/10\/Unbenannt-30-336x168.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/117472","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/comments?post=117472"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/117472\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media\/117467"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media?parent=117472"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/categories?post=117472"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/tags?post=117472"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}