{"id":120096,"date":"2024-11-25T09:27:14","date_gmt":"2024-11-25T08:27:14","guid":{"rendered":"https:\/\/www.immo-invest.ch\/strabag-legt-neue-leitungen-fuer-fernwaermenetz-in-muenchenbuchsee\/"},"modified":"2024-11-25T09:54:30","modified_gmt":"2024-11-25T08:54:30","slug":"strabag-legt-neue-leitungen-fuer-fernwaermenetz-in-muenchenbuchsee","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/fr\/strabag-legt-neue-leitungen-fuer-fernwaermenetz-in-muenchenbuchsee\/","title":{"rendered":"Extension du chauffage urbain \u00e0 M\u00fcnchenbuchsee"},"content":{"rendered":"<p class=\"bodytext\">L&rsquo;entreprise de construction <a href=\"https:\/\/www.strabag.ch\/\" target=\"_blank\" rel=\"noopener\">STRABAG<\/a> de Schlier cr&eacute;e un approvisionnement &eacute;nerg&eacute;tique moderne pour la commune de M&uuml;nchenbuchsee gr&acirc;ce &agrave; des conduites de chauffage &agrave; distance. Selon un <a href=\"https:\/\/www.strabag.ch\/aktuelles\/2024-11\/1411-fernwaermeleitungen-muenchenbuchsee\" target=\"_blank\" rel=\"noopener\">communiqu&eacute;<\/a>, STRABAG pose environ trois kilom&egrave;tres de nouvelles conduites de chauffage urbain afin d&rsquo;&eacute;tendre le r&eacute;seau de chauffage urbain de cette commune du Mittelland bernois. Les travaux ont commenc&eacute; le 9 septembre et la premi&egrave;re des quelque 15 &eacute;tapes est d&eacute;j&agrave; termin&eacute;e, selon STRABAG. Deux autres &eacute;tapes suivront d&rsquo;ici la fin de l&rsquo;ann&eacute;e, pr&eacute;cise le communiqu&eacute; de l&rsquo;entreprise.<\/p>\n<p class=\"bodytext\">Concernant le d&eacute;roulement des travaux, il est pr&eacute;cis&eacute; que les riverains ayant toujours besoin d&rsquo;acc&eacute;der &agrave; leur logement et &agrave; leur garage, la rue ne peut pas &ecirc;tre enti&egrave;rement ferm&eacute;e pour les travaux. Pour l&rsquo;installation des conduites de chauffage urbain, pr&egrave;s d&rsquo;un quart de la rue sera ouvert et les conduites seront pos&eacute;es. Apr&egrave;s chaque phase de construction, les tranch&eacute;es seront temporairement remblay&eacute;es avec de la terre et un rev&ecirc;tement provisoire sera appliqu&eacute;. Au cours des prochains mois, la terre se tassera. C&rsquo;est pourquoi, apr&egrave;s l&rsquo;ex&eacute;cution des 15 &eacute;tapes, le rev&ecirc;tement provisoire sera &agrave; nouveau frais&eacute; et une nouvelle couche d&rsquo;asphalte sera appliqu&eacute;e.<\/p>\n<p class=\"bodytext\">Selon STRABAG, les travaux de construction seront probablement achev&eacute;s par l&rsquo;&eacute;quipe STRABAG de la construction de voies de communication (VWB) &agrave; Berne d&rsquo;ici d&eacute;cembre 2025. &laquo;&nbsp;Jusqu&rsquo;&agrave; pr&eacute;sent, nous sommes bien dans les temps et nous devrions terminer le projet dans les temps&nbsp;&raquo;, d&eacute;clare Lena Wagner, chef de chantier de VWB Berne.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>STRABAG \u00e9tend l&rsquo;approvisionnement en chaleur \u00e0 M\u00fcnchenbuchsee. Environ trois kilom\u00e8tres de nouvelles conduites de chauffage urbain seront pos\u00e9es. Les travaux seront divis\u00e9s en 15 \u00e9tapes et devraient \u00eatre termin\u00e9s en d\u00e9cembre 2025.<\/p>\n","protected":false},"author":2,"featured_media":6788,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22699,8747,743,739],"tags":[3122,50743,6340,3784,872,3931,2002,3346],"class_list":["post-120096","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-durabilite","category-energie","category-immonews-fr","category-projects","tag-bauprojekt-fr","tag-bern-mittelland-fr","tag-energieversorgung-fr","tag-fernwaerme-fr","tag-immoinvest-fr","tag-immonews-fr","tag-news-fr","tag-strabag-fr"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"STRABAG \u00e9tend l'approvisionnement en chaleur \u00e0 M\u00fcnchenbuchsee. Environ trois kilom\u00e8tres de nouvelles conduites de chauffage urbain seront pos\u00e9es. Les travaux seront divis\u00e9s en 15 \u00e9tapes et devraient \u00eatre termin\u00e9s en d\u00e9cembre 2025.","autor":"ce\/gba\u00a0","ort":"Schlieren ZH\/M\u00fcnchenbuchsee BE","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2020\/04\/energie_5-3-150x150.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/120096","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/comments?post=120096"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/120096\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media\/6788"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media?parent=120096"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/categories?post=120096"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/tags?post=120096"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}