{"id":35254,"date":"2022-04-07T08:44:10","date_gmt":"2022-04-07T06:44:10","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=35254"},"modified":"2022-04-07T08:44:14","modified_gmt":"2022-04-07T06:44:14","slug":"amberg-engineering-recoit-une-commande-de-la-deutsche-bahn","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/fr\/amberg-engineering-recoit-une-commande-de-la-deutsche-bahn\/","title":{"rendered":"Amberg Engineering re\u00e7oit une commande de la Deutsche Bahn"},"content":{"rendered":"<p class=\"bodytext\"><a href=\"https:\/\/amberggroup.com\/de\/\" target=\"_blank\" rel=\"noopener\">Amberg Engineering<\/a> a remport&eacute; le tirage au sort pour la planification de la nouvelle ligne ferroviaire entre Innleiten et Kirnstein pr&egrave;s de Rosenheim en Bavi&egrave;re. En joint-venture avec <a href=\"https:\/\/www.obermeyer-group.com\/unternehmen\/obermeyer-infrastruktur\" target=\"_blank\" rel=\"noopener\">Obermeyer Infrastructure<\/a> , la soci&eacute;t&eacute; de conseil bas&eacute;e &agrave; Regensdorf doit traiter la commande de la Deutsche Bahn (DB) dans <a href=\"https:\/\/www.brennernordzulauf.eu\/chancen-ziele.html\" target=\"_blank\" rel=\"noopener\">le projet Brenner Nordzulauf<\/a> , selon un communiqu&eacute; de <a href=\"https:\/\/amberggroup.com\/de\/news-events\/amberg-group-news\/news\/planning-contract-brenner-north-approach-3\/?tx_news_pi1%5Bcontroller%5D=News&amp;tx_news_pi1%5Baction%5D=detail&amp;cHash=86e7eed1e79072d3cf28029b18046f47\" target=\"_blank\" rel=\"noopener\">presse<\/a> . Les deux entreprises travaillent d&eacute;j&agrave; ensemble sur un projet en cours sur le tunnel de base du Brenner.<\/p>\n<p class=\"bodytext\"> La section de planification Innleiten-Kirnstein du projet d&rsquo;extension du r&eacute;seau ferroviaire Brenner-Nordzulauf comprend, entre autres, la planification des deux tunnels Ringelfeld et Steinkirchen, y compris l&rsquo;&eacute;quipement technique du tunnel, la planification des voies ferr&eacute;es et des routes ainsi que la planification des la nouvelle construction de structures de survol, d&rsquo;auges, de murs anti-bruit et de structures de support.<\/p>\n<p class=\"bodytext\"> Le processus num&eacute;rique Building Information Modeling (BIM) est contractuellement obligatoire. &laquo; Nous sommes tr&egrave;s heureux de pouvoir montrer notre expertise en mati&egrave;re de planification dans un projet de planification DB global aussi expos&eacute;. De plus, avec les personnes impliqu&eacute;es dans le projet, nous pouvons d&eacute;velopper davantage la m&eacute;thodologie BIM dans la planification des infrastructures &raquo;, a d&eacute;clar&eacute; Christoph Heiter, ing&eacute;nieur chez Obermeyer Infrastructure.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Amberg Engineering hat den Zuschlag f\u00fcr die Planung einer neuen Bahnstrecke von der Deutschen Bahn erhalten. Diese verbindet die deutschen Ortschaften Innleiten und Kirnstein. <\/p>\n","protected":false},"author":2,"featured_media":35249,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22696,22353,22703],"tags":[25444,25445,1584,833,2209,25446,1197,10708,25447,872,3931,25448,25449,2002,25450,25451],"class_list":["post-35254","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-entreprise","category-international-fr","category-mobilite","tag-amberg-engineering-fr","tag-bahnstrecke-fr","tag-bau-fr","tag-bauen-fr","tag-bauwesen-fr","tag-bayern-2-fr","tag-bim-fr","tag-building-information-modelling-fr","tag-db-fr","tag-immoinvest-fr","tag-immonews-fr","tag-innleiten-fr","tag-kirnstein-fr","tag-news-fr","tag-obermeyer-infrastruktur-fr","tag-projekt-brenner-nordzulauf-fr"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Amberg Engineering a remport\u00e9 le contrat de planification d&#39;une nouvelle ligne ferroviaire par la Deutsche Bahn. Cela relie les villes allemandes d&#39;Innleiten et de Kirnstein.","autor":"ko, Bild: DB Netz AG","ort":"Regensdorf ZH","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2022\/04\/immoinvest_Deutsche_Bahn_1-336x168.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/35254","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/comments?post=35254"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/35254\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media\/35249"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media?parent=35254"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/categories?post=35254"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/tags?post=35254"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}