{"id":5618,"date":"2020-06-15T11:45:54","date_gmt":"2020-06-15T09:45:54","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=5618"},"modified":"2020-06-15T11:45:56","modified_gmt":"2020-06-15T09:45:56","slug":"argovie-va-de-lavant-avec-la-limmattalbahn","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/fr\/argovie-va-de-lavant-avec-la-limmattalbahn\/","title":{"rendered":"Argovie va de l&#39;avant avec la Limmattalbahn"},"content":{"rendered":"<p class=\"wp-block-paragraph\"> Le conseil de gouvernement a transmis un message au Grand Conseil, selon un communiqu&eacute; de presse. En cons&eacute;quence, la poursuite de la Limmattalbahn de Killwangen &agrave; Baden devrait maintenant &ecirc;tre port&eacute;e au niveau de r&eacute;sultat interm&eacute;diaire. Jusqu&rsquo;&agrave; pr&eacute;sent, le projet a &eacute;t&eacute; inscrit dans le plan de structure cantonal &agrave; titre d&rsquo;orientation pr&eacute;liminaire. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> Dans la communication, le canton fait r&eacute;f&eacute;rence au lien &eacute;troit entre la Limmattalbahn et le concept r&eacute;gional de trafic global Ostaargau (rGVK OASE) dans la r&eacute;gion de Baden. Selon cela, les mesures dans la r&eacute;gion de Baden &laquo;&nbsp;devraient rester dans le plan de structure au niveau des r&eacute;sultats interm&eacute;diaires&nbsp;&raquo;. &laquo;&nbsp;En revanche, les mesures pour le rGVK OASE dans la r&eacute;gion de Brugg-Windisch doivent &ecirc;tre relev&eacute;es au niveau de la fixation par d&eacute;cision du Grand Conseil avant la fin de 2020.&nbsp;&raquo; <\/p>\n\n\n\n<p class=\"wp-block-paragraph\"> La Limmattalbahn est &laquo;&nbsp;un &eacute;l&eacute;ment central pour r&eacute;pondre aux besoins de mobilit&eacute; futurs et croissants dans le corridor Killwangen-Neuenhof-Wettingen-Baden&nbsp;&raquo;. Gr&acirc;ce &agrave; eux, la haute position g&eacute;ographique et le maintien de la viabilit&eacute; &eacute;conomique de la r&eacute;gion peuvent &ecirc;tre assur&eacute;s. L&rsquo;ambassade du conseil gouvernemental s&rsquo;occupe &eacute;galement des nouvelles escales &agrave; Wettingen et Spreitenbach. &laquo;&nbsp;Le futur arr&ecirc;t des CFF &agrave; Wettingen T&auml;gerhard est destin&eacute; &agrave; relier le S-Bahn, le bus et la Limmattalbahn et &agrave; relier de mani&egrave;re optimale la concentration pr&eacute;vue sur T&auml;gerhard-Ost aux transports en commun.&nbsp;&raquo; &agrave; l&rsquo;est de Spreitenbach, qui &laquo;devrait permettre une utilisation r&eacute;sidentielle et commerciale dense, urbaine &agrave; long terme&raquo;. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le conseil de gouvernement a transmis un message au Grand Conseil, selon un communiqu\u00e9 de presse. En cons\u00e9quence, la poursuite de la Limmattalbahn de Killwangen \u00e0 Baden devrait maintenant \u00eatre port\u00e9e au niveau de r\u00e9sultat interm\u00e9diaire. Jusqu&rsquo;\u00e0 pr\u00e9sent, le projet a \u00e9t\u00e9 inscrit dans le plan de structure cantonal \u00e0 titre d&rsquo;orientation pr\u00e9liminaire. Dans la &#8230; <a title=\"Argovie va de l&#039;avant avec la Limmattalbahn\" class=\"read-more\" href=\"https:\/\/stage.immo-invest.ch\/fr\/argovie-va-de-lavant-avec-la-limmattalbahn\/\" aria-label=\"En savoir plus sur Argovie va de l&#039;avant avec la Limmattalbahn\">Lire la suite<\/a><\/p>\n","protected":false},"author":2,"featured_media":5605,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[4897,743,8452],"tags":[1999,2000,872,2001,1653,1800,2002,1991,1992,1132],"class_list":["post-5618","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-region-aarau","category-immonews-fr","category-regions","tag-aargau-fr","tag-baden-fr","tag-immoinvest-fr","tag-killwangen-fr","tag-limmattal-fr","tag-limmattalbahn-fr","tag-news-fr","tag-oeffentlicher-fr","tag-oev-fr","tag-verkehr-fr"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Le conseil gouvernemental d&#39;Argovie soutient la poursuite de la Limmattalbahn de Killwangen \u00e0 Baden. Un projet correspondant devrait donc d\u00e9sormais recevoir un nouveau statut.","autor":"jh","ort":"Aarau","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2020\/06\/oeffentlicher_verkehr_2-150x150.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/5618","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/comments?post=5618"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/5618\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media\/5605"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media?parent=5618"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/categories?post=5618"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/tags?post=5618"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}