{"id":61326,"date":"2023-08-08T11:17:46","date_gmt":"2023-08-08T09:17:46","guid":{"rendered":"https:\/\/www.immo-invest.ch\/doppelspurausbaus-ligerz-twann-ein-komplexes-bahninfrastrukturprojekt\/"},"modified":"2023-08-08T11:21:14","modified_gmt":"2023-08-08T09:21:14","slug":"doppelspurausbaus-ligerz-twann-ein-komplexes-bahninfrastrukturprojekt","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/fr\/doppelspurausbaus-ligerz-twann-ein-komplexes-bahninfrastrukturprojekt\/","title":{"rendered":"Doublement de la voie Gl\u00e9resse-Douanne un projet d&rsquo;infrastructure ferroviaire complexe"},"content":{"rendered":"<p class=\"wp-block-paragraph\">Le contrat porte sur la construction d&rsquo;un tunnel &agrave; double voie de 2,1 km de long &ndash; dont environ 1 850 m en construction mini&egrave;re et environ 250 m en construction &agrave; ciel ouvert &ndash; y compris le rev&ecirc;tement en b&eacute;ton et les &eacute;quipements ferroviaires. En outre, quatre galeries de secours seront construites, ainsi qu&rsquo;un viaduc de 114 m de long pour la sortie de l&rsquo;autoroute N5 et divers ouvrages compl&eacute;mentaires. Le transport des mat&eacute;riaux d&rsquo;excavation et de d&eacute;blai se fera par bateau et la voie ferr&eacute;e existante sera d&eacute;mantel&eacute;e et r&eacute;am&eacute;nag&eacute;e.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&rsquo;objectif du projet est de supprimer le dernier goulot d&rsquo;&eacute;tranglement ferroviaire sur la ligne du pied du Jura entre Lausanne et Bienne. En raison de l&rsquo;espace restreint qui pr&eacute;vaut entre le lac et le versant, o&ugrave; passent &eacute;galement la route nationale N5 et la route cantonale, un nouveau tunnel &agrave; double voie sera construit.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">L&rsquo;emplacement du projet dans des zones prot&eacute;g&eacute;es constitue un d&eacute;fi particulier : La r&eacute;gion est inscrite &agrave; l&rsquo;Inventaire f&eacute;d&eacute;ral des paysages, sites et monuments naturels (IFP). Les villages de La Neuveville, Chavannes, Ligerz et Twann font partie de l&rsquo;Inventaire f&eacute;d&eacute;ral des sites construits d&rsquo;importance nationale &agrave; prot&eacute;ger en Suisse (ISOS).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Christian Sp&auml;th, Head Division Civil Engineering chez Implenia : &laquo;&nbsp;Nous nous r&eacute;jouissons de r&eacute;aliser ce grand projet d&rsquo;infrastructure ferroviaire complexe en collaboration avec nos partenaires du consortium et de d&eacute;montrer une nouvelle fois notre longue exp&eacute;rience et notre expertise dans ce domaine. Nous souhaitons &agrave; toute l&rsquo;&eacute;quipe de projet une p&eacute;riode de construction sans accident&nbsp;&raquo;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Le consortium IBD, compos\u00e9 des partenaires Implenia (chef de file), Bernasconi et De Luca, s&rsquo;est vu attribuer le lot 2 \u00ab\u00a0Tunnel de Gl\u00e9resse\u00a0\u00bb par les CFF. Le volume total de la commande s&rsquo;\u00e9l\u00e8ve \u00e0 CHF 220 millions, la part d&rsquo;Implenia \u00e9tant d&rsquo;environ CHF 150 millions.<\/p>\n","protected":false},"author":2,"featured_media":61317,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22357],"tags":[41182,25781,41183,41184,21541,1087],"class_list":["post-61326","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-industrie-du-batiment","tag-anteil-fr","tag-auftrag-fr","tag-ausbruchmaterial-fr","tag-bauinfrastrukturprojekt-fr","tag-bauzeit-fr","tag-projekt-fr"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Le consortium IBD, compos\u00e9 des partenaires Implenia (chef de file), Bernasconi et De Luca, s'est vu attribuer le lot 2 \"Tunnel de Gl\u00e9resse\" par les CFF. Le volume total de la commande s'\u00e9l\u00e8ve \u00e0 CHF 220 millions, la part d'Implenia \u00e9tant d'environ CHF 150 millions.","autor":"Quelle: www.baumeister.swiss, Bild: www.baumeister.swiss","ort":"","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2023\/08\/Bauen_betonieren-336x168.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/61326","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/comments?post=61326"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/61326\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media\/61317"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media?parent=61326"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/categories?post=61326"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/tags?post=61326"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}