{"id":64124,"date":"2023-09-19T09:34:14","date_gmt":"2023-09-19T07:34:14","guid":{"rendered":"https:\/\/www.immo-invest.ch\/kva-turgi-soll-fuer-325-millionen-franken-erneuert-werden\/"},"modified":"2023-09-19T10:16:53","modified_gmt":"2023-09-19T08:16:53","slug":"kva-turgi-soll-fuer-325-millionen-franken-erneuert-werden","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/fr\/kva-turgi-soll-fuer-325-millionen-franken-erneuert-werden\/","title":{"rendered":"L&rsquo;UIOM de Turgi doit \u00eatre r\u00e9nov\u00e9e pour 325 millions de francs suisses"},"content":{"rendered":"<p class=\"bodytext\">Apr&egrave;s 50 ans d&rsquo;exploitation, l&rsquo;<a href=\"http:\/\/www.kva2030.ch\/\" target=\"_blank\" rel=\"noopener\">UIOM de Turgi<\/a> doit &ecirc;tre r&eacute;nov&eacute;e. Selon un communiqu&eacute; de presse, le comit&eacute; directeur demandera &agrave; cet effet un cr&eacute;dit d&rsquo;&eacute;tude de 17 millions de francs lors de la prochaine assembl&eacute;e des d&eacute;l&eacute;gu&eacute;s le 27 septembre. Le co&ucirc;t total de la r&eacute;novation est estim&eacute; &agrave; 325 millions de francs. Selon les informations fournies, la n&eacute;cessit&eacute; d&rsquo;une r&eacute;novation se traduit &eacute;galement par une augmentation des d&eacute;penses de r&eacute;paration et d&rsquo;entretien.<\/p>\n<p class=\"bodytext\">Apr&egrave;s une phase de planification de plusieurs ann&eacute;es, la construction ne pourra vraisemblablement pas commencer avant 2028. La nouvelle UIOM pourrait alors &ecirc;tre mise en service en 2033. Les derniers travaux de r&eacute;novation de l&rsquo;installation avaient &eacute;t&eacute; r&eacute;alis&eacute;s dans les ann&eacute;es 1990.<\/p>\n<p class=\"bodytext\">L&rsquo;UIOM a <a href=\"https:\/\/www.kva.ch\/fileadmin\/files\/pdf\/AV_2023_-_2_Projektierungskredit.pdf\" target=\"_blank\" rel=\"noopener\">mis en<\/a>ligne sur son site Internet, outre l&rsquo;invitation &agrave; l&rsquo;assembl&eacute;e des d&eacute;l&eacute;gu&eacute;s, un ensemble de documents comprenant l&rsquo;&eacute;tude de faisabilit&eacute; du projet ainsi que la proposition d&eacute;taill&eacute;e du pr&eacute;sident Philippe Ramseier concernant le <a href=\"https:\/\/www.kva.ch\/fileadmin\/files\/pdf\/AV_2023_-_2_Projektierungskredit.pdf\" target=\"_blank\" rel=\"noopener\">cr&eacute;dit d&rsquo;&eacute;tude<\/a>.<\/p>\n<p class=\"bodytext\">Selon ces documents, la direction et le comit&eacute; de l&rsquo;UIOM se penchent depuis 2015 d&eacute;j&agrave; sur le renouvellement des installations obsol&egrave;tes. Une collaboration avec les installations voisines de Buchs AG et Dietikon ZH a &eacute;t&eacute; examin&eacute;e. Toutes deux l&rsquo;ont toutefois refus&eacute;e. Apr&egrave;s l&rsquo;&eacute;tude de faisabilit&eacute; de 2022, le conseil d&rsquo;administration de l&rsquo;UIOM a d&eacute;cid&eacute; de placer les nouvelles installations sur une parcelle voisine de l&rsquo;<a href=\"https:\/\/www.abwturgi.ch\/\" target=\"_blank\" rel=\"noopener\">association de traitement des eaux us&eacute;es de la r&eacute;gion de Baden Wettingen<\/a>. L&rsquo;exploitation pourra ainsi se poursuivre pendant les travaux de r&eacute;novation.<\/p>\n<p class=\"bodytext\">L&rsquo;UIOM de Turgi traite environ 120 000 tonnes de d&eacute;chets par an. Pour le chauffage &agrave; distance qui en est issu, on s&rsquo;attend &agrave; une augmentation mod&eacute;r&eacute;e des prix en raison des co&ucirc;ts de r&eacute;novation.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>L&rsquo;usine d&rsquo;incin\u00e9ration des ordures m\u00e9nag\u00e8res (UIOM) de Turgi doit \u00eatre r\u00e9nov\u00e9e. L&rsquo;Assembl\u00e9e des d\u00e9l\u00e9gu\u00e9s se prononcera le 27 septembre sur un cr\u00e9dit d&rsquo;\u00e9tude de 17 millions de francs. Les co\u00fbts totaux sont estim\u00e9s \u00e0 325 millions.<\/p>\n","protected":false},"author":2,"featured_media":15312,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[22699,743,9652],"tags":[835,8692,1685,42171,41052,42172,3494,42173],"class_list":["post-64124","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-durabilite","category-immonews-fr","category-renovation","tag-energie-fr","tag-erneuerung-fr","tag-finanzen-fr","tag-gesamtkosten-fr","tag-instandhaltung-fr","tag-kehrrichtvertertung-fr","tag-kredit-fr","tag-reparaturen-fr"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"L'usine d'incin\u00e9ration des ordures m\u00e9nag\u00e8res (UIOM) de Turgi doit \u00eatre r\u00e9nov\u00e9e. L'Assembl\u00e9e des d\u00e9l\u00e9gu\u00e9s se prononcera le 27 septembre sur un cr\u00e9dit d'\u00e9tude de 17 millions de francs. Les co\u00fbts totaux sont estim\u00e9s \u00e0 325 millions.","autor":"ce\/gba\u00a0","ort":"Turgi AG","bildunterschrift":"","bild_im_grid":false,"gallerie":"","newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2021\/03\/auszeichnung-bau-4-150x150.jpg","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/64124","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/comments?post=64124"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/64124\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media\/15312"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media?parent=64124"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/categories?post=64124"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/tags?post=64124"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}