{"id":7863,"date":"2020-09-02T10:06:14","date_gmt":"2020-09-02T08:06:14","guid":{"rendered":"https:\/\/www.immo-invest.ch\/?p=7863"},"modified":"2020-09-02T10:06:15","modified_gmt":"2020-09-02T08:06:15","slug":"le-lake-zurich-education-center-inaugure-un-nouveau-batiment","status":"publish","type":"post","link":"https:\/\/stage.immo-invest.ch\/fr\/le-lake-zurich-education-center-inaugure-un-nouveau-batiment\/","title":{"rendered":"Le Lake Zurich Education Center inaugure un nouveau b\u00e2timent"},"content":{"rendered":"<p class=\"bodytext\"> Patrick Heeb, recteur du Lake Zurich Education Center ( <a href=\"https:\/\/www.bzz.ch\/\" target=\"_blank\" rel=\"noopener noreferrer\">BZZ<\/a> ), a inaugur&eacute; mardi un nouveau b&acirc;timent au BZZ &agrave; Horgen, avec la pr&eacute;sidente de district et directrice de l&rsquo;&eacute;ducation Silvia Steiner (ZH \/ CVP) ainsi que le conseiller du gouvernement et directeur de la construction Martin Neukom (ZH \/ GPS). Les apprentis BZZ ont d&eacute;j&agrave; emm&eacute;nag&eacute; dans le nouveau b&acirc;timent de l&rsquo;&eacute;cole.<\/p>\n<p class=\"bodytext\"> Le nouveau b&acirc;timent, qui vient d&rsquo;&ecirc;tre inaugur&eacute;, est destin&eacute; &agrave; couvrir les besoins d&rsquo;espace croissants de l&rsquo;&eacute;cole, selon un <a href=\"https:\/\/www.zh.ch\/de\/news-uebersicht\/medienmitteilungen\/2020\/09\/bildungszentrum-zuerichsee-neubau-mit-sporthalle-eingeweiht.html?pk_campaign=newsletter&amp;pk_kwd=Bildung&amp;pk_source=immediately&amp;pk_medium=Einweihung-Bildungszentrum-Z\" target=\"_blank\" rel=\"noopener noreferrer\">communiqu&eacute; de presse<\/a> . Avec lui, l&rsquo;&eacute;cole dispose de nouvelles salles de classe et d&rsquo;un nouveau triple gymnase. La salle de sport est mise &agrave; disposition du service des sports de la commune d&rsquo;Horgen en dehors des heures d&rsquo;enseignement.<\/p>\n<p class=\"bodytext\"> Apr&egrave;s l&rsquo;ach&egrave;vement du nouveau b&acirc;timent, la r&eacute;novation du b&acirc;timent existant commencera. Une fois les travaux de construction termin&eacute;s, le BZZ pourra profiter de son emplacement sur le lac de Zurich. Il utilisera l&rsquo;eau du lac pour g&eacute;n&eacute;rer du froid et de la chaleur.<\/p>\n","protected":false},"excerpt":{"rendered":"<p> Das Bildungszentrum Z\u00fcrichsee hat am Dienstag einen Neubau in Horgen eingeweiht. Dieser erg\u00e4nzt das bestehende Geb\u00e4ude, das nun saniert werden soll. Nach dem Abschluss der Arbeiten werden die Bauten Wasser aus dem Z\u00fcrichsee zur K\u00e4lte- und W\u00e4rmeerzeugung nutzen.<\/p>\n","protected":false},"author":2,"featured_media":6525,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"_surecart_dashboard_logo_width":"180px","_surecart_dashboard_show_logo":true,"_surecart_dashboard_navigation_orders":true,"_surecart_dashboard_navigation_invoices":true,"_surecart_dashboard_navigation_subscriptions":true,"_surecart_dashboard_navigation_downloads":true,"_surecart_dashboard_navigation_billing":true,"_surecart_dashboard_navigation_account":true,"inline_featured_image":false,"footnotes":""},"categories":[743,9824,8452,4957],"tags":[1584,833,3060,3061,3062,872,2225,2002],"class_list":["post-7863","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-immonews-fr","category-nouvelle-construction","category-regions","category-region-zurich","tag-bau-fr","tag-bauen-fr","tag-bidungszentrum-zuerichsee-fr","tag-bildung-fr","tag-bzz-fr","tag-immoinvest-fr","tag-neubau-fr","tag-news-fr"],"acf":{"bild_mit_ki_erstellt_worden":[],"lead":"Le centre \u00e9ducatif du lac de Zurich a inaugur\u00e9 mardi un nouveau b\u00e2timent \u00e0 Horgen. Cela compl\u00e8te le b\u00e2timent existant, qui doit maintenant \u00eatre r\u00e9nov\u00e9. Une fois les travaux termin\u00e9s, les b\u00e2timents utiliseront l&#39;eau du lac de Zurich pour produire du froid et de la chaleur.","autor":"ssp","ort":"Horgen ZH","bildunterschrift":"","bild_im_grid":false,"gallerie":null,"newsim":"","zusammenfassung":""},"featured_image_src":"https:\/\/stage.immo-invest.ch\/wp-content\/uploads\/2020\/07\/immobilien_5-150x150.png","_links":{"self":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/7863","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/users\/2"}],"replies":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/comments?post=7863"}],"version-history":[{"count":0,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/posts\/7863\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media\/6525"}],"wp:attachment":[{"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/media?parent=7863"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/categories?post=7863"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/stage.immo-invest.ch\/fr\/wp-json\/wp\/v2\/tags?post=7863"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}